Fuzzy Assessment of Steel Deck Pavement for Long Suspension Bridge of the Fourth Nanjing Yangtze River Bridge
The Fourth Nanjing Yangtze River Bridge (the Fourth Bridge) with the main span of 1418 m is the largest three-span suspension bridge in China and the third largest in the world. The service circumstance of steel deck pavement on the Fourth Bridge is complex and severe, so that the scheme evaluation...
Saved in:
Main Authors: | Jinyu Zong, Keqiang Zhang, Binggen Zhan, Rui Ma |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/8857407 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The Impact of Traffic-Induced Bridge Vibration on Rapid Repairing High-Performance Concrete for Bridge Deck Pavement Repairs
by: Wei Wang, et al.
Published: (2014-01-01) -
Overview: Application of Resin Waterproof Adhesive Materials in Bridge Deck Pavement in China
by: Lu Zhou, et al.
Published: (2022-01-01) -
Decision Method of Bridge Deck Pavement Maintenance Based on the Decision Maker’s Objective
by: Xiaofei Liang, et al.
Published: (2021-01-01) -
Ductile–Brittle Transition Temperature of Epoxy Asphalt Concrete of Steel Bridge Deck Pavement Based on Impact Toughness
by: Shunxian Zhang, et al.
Published: (2023-01-01) -
Low-Temperature Performance and Evaluation Index of Gussasphalt for Steel Bridge Decks
by: Hongyu Ye, et al.
Published: (2019-01-01)