Production Lot Sizing and Process Targeting under Process Deterioration and Machine Breakdown Conditions
The paper considers a production facility that might deteriorate suddenly at some point during the production run time; after deterioration, nonconforming items are produced in a greater rate compared to the rate before deterioration. Moreover, the production facility may ultimately break down; cons...
Saved in:
| Main Authors: | , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2012-01-01
|
| Series: | Modelling and Simulation in Engineering |
| Online Access: | http://dx.doi.org/10.1155/2012/393495 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!