Operational Risk Assessment of Distribution Network Equipment Based on Rough Set and D-S Evidence Theory

With the increasing complication, compaction, and automation of distribution network equipment, a small failure will cause an outbreak chain reaction and lead to operational risk in the power distribution system, even in the whole power system. Therefore, scientific assessment of power distribution...

Full description

Saved in:
Bibliographic Details
Main Authors: Cunbin Li, Gefu Qing, Peng Li, Tingting Yin
Format: Article
Language:English
Published: Wiley 2013-01-01
Series:Journal of Applied Mathematics
Online Access:http://dx.doi.org/10.1155/2013/263905
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832556084237172736
author Cunbin Li
Gefu Qing
Peng Li
Tingting Yin
author_facet Cunbin Li
Gefu Qing
Peng Li
Tingting Yin
author_sort Cunbin Li
collection DOAJ
description With the increasing complication, compaction, and automation of distribution network equipment, a small failure will cause an outbreak chain reaction and lead to operational risk in the power distribution system, even in the whole power system. Therefore, scientific assessment of power distribution equipment operation risk is significant to the security of power distribution system. In order to get the satisfactory assessment conclusions from the complete and incomplete information and improve the assessment level, an operational risk assessment model of distribution network equipment based on rough set and D-S evidence theory was built. In this model, the rough set theory was used to simplify and optimize the operation risk assessment indexes of distribution network equipment and the evidence D-S theory was adopted to combine the optimal indexes. At last, the equipment operational risk level was obtained from the basic probability distribution decision. Taking the transformer as an example, this paper compared the assessment result obtained from the method proposed in this paper with that from the ordinary Rogers ratio method and discussed the application of the proposed method. It proved that the method proposed in this paper is feasible, efficient, and provides a new way to assess the distribution network equipment operational risk.
format Article
id doaj-art-adb73ecb76214388bcddb5ebd05fb184
institution Kabale University
issn 1110-757X
1687-0042
language English
publishDate 2013-01-01
publisher Wiley
record_format Article
series Journal of Applied Mathematics
spelling doaj-art-adb73ecb76214388bcddb5ebd05fb1842025-02-03T05:46:27ZengWileyJournal of Applied Mathematics1110-757X1687-00422013-01-01201310.1155/2013/263905263905Operational Risk Assessment of Distribution Network Equipment Based on Rough Set and D-S Evidence TheoryCunbin Li0Gefu Qing1Peng Li2Tingting Yin3School of Economics and Management, North China Electric Power University, Beijing 102206, ChinaSchool of Economics and Management, North China Electric Power University, Beijing 102206, ChinaSchool of Economics and Management, North China Electric Power University, Beijing 102206, ChinaSchool of Economics and Management, North China Electric Power University, Beijing 102206, ChinaWith the increasing complication, compaction, and automation of distribution network equipment, a small failure will cause an outbreak chain reaction and lead to operational risk in the power distribution system, even in the whole power system. Therefore, scientific assessment of power distribution equipment operation risk is significant to the security of power distribution system. In order to get the satisfactory assessment conclusions from the complete and incomplete information and improve the assessment level, an operational risk assessment model of distribution network equipment based on rough set and D-S evidence theory was built. In this model, the rough set theory was used to simplify and optimize the operation risk assessment indexes of distribution network equipment and the evidence D-S theory was adopted to combine the optimal indexes. At last, the equipment operational risk level was obtained from the basic probability distribution decision. Taking the transformer as an example, this paper compared the assessment result obtained from the method proposed in this paper with that from the ordinary Rogers ratio method and discussed the application of the proposed method. It proved that the method proposed in this paper is feasible, efficient, and provides a new way to assess the distribution network equipment operational risk.http://dx.doi.org/10.1155/2013/263905
spellingShingle Cunbin Li
Gefu Qing
Peng Li
Tingting Yin
Operational Risk Assessment of Distribution Network Equipment Based on Rough Set and D-S Evidence Theory
Journal of Applied Mathematics
title Operational Risk Assessment of Distribution Network Equipment Based on Rough Set and D-S Evidence Theory
title_full Operational Risk Assessment of Distribution Network Equipment Based on Rough Set and D-S Evidence Theory
title_fullStr Operational Risk Assessment of Distribution Network Equipment Based on Rough Set and D-S Evidence Theory
title_full_unstemmed Operational Risk Assessment of Distribution Network Equipment Based on Rough Set and D-S Evidence Theory
title_short Operational Risk Assessment of Distribution Network Equipment Based on Rough Set and D-S Evidence Theory
title_sort operational risk assessment of distribution network equipment based on rough set and d s evidence theory
url http://dx.doi.org/10.1155/2013/263905
work_keys_str_mv AT cunbinli operationalriskassessmentofdistributionnetworkequipmentbasedonroughsetanddsevidencetheory
AT gefuqing operationalriskassessmentofdistributionnetworkequipmentbasedonroughsetanddsevidencetheory
AT pengli operationalriskassessmentofdistributionnetworkequipmentbasedonroughsetanddsevidencetheory
AT tingtingyin operationalriskassessmentofdistributionnetworkequipmentbasedonroughsetanddsevidencetheory