Harmonic analysis of traction power supply system: case study of Addis Ababa light rail transit
Abstract Addis Ababa, the capital of Ethiopia, inaugurated the first electrified light rail transitsystem 4 years ago in September 2015, which makes it the first of its kind in sub‐Saharan and eastern African countries. The railway line has a total length of 34.25 km with 39 passenger stations and 1...
Saved in:
| Main Authors: | Shimelis Atli Assefa, Asegid Belay Kebede, Demissu Legese |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2021-12-01
|
| Series: | IET Electrical Systems in Transportation |
| Online Access: | https://doi.org/10.1049/els2.12019 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Corrigendum to “Assessment on the Current and Future Performance of Addis Ababa Light Rail Transit Service Using Mathematical Modeling”
by: Getu Debebe, et al.
Published: (2024-01-01) -
Firsthand report on solid waste management practice in the major town of Addis Ababa-Adama economic corridor, Ethiopia
by: Shimelis Kebede Kassahun, et al.
Published: (2025-01-01) -
Effect of compositions and hardness on wheel-rail contact analysis and wear behavior of wheel materials using finite element method: a case study of Addis Ababa light rail transit
by: Leul Fenta Demisie, et al.
Published: (2025-07-01) -
Floristic Diversity and Natural Regeneration Status of Entoto Mountain and the Surrounding Area in Addis Ababa, Ethiopia
by: Ergua Atinafe, et al.
Published: (2020-01-01) -
The effect of water loss on demand–supply departure of Addis Ababa, Ethiopia
by: Peniel Bafe Unto
Published: (2024-10-01)