A hydropower plant scheduling model considering the stochastic correlation between runoff and electricity prices
Evaluating and addressing the risks posed by runoff and electricity prices in hydropower plants involved in medium-to long-term scheduling is a pressing issue. To address this, a scheduling model is proposed that aims to maximize expected net revenue while minimizing medium- to long-term operational...
Saved in:
Main Authors: | WU Ying, WANG Juefei, LI Junjie, WANG Kun, SHEN Yan, WU Yingjun |
---|---|
Format: | Article |
Language: | zho |
Published: |
zhejiang electric power
2025-01-01
|
Series: | Zhejiang dianli |
Subjects: | |
Online Access: | https://zjdl.cbpt.cnki.net/WKE3/WebPublication/paperDigest.aspx?paperID=19c57fa0-220f-4ea3-8dba-b15e0582714c |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Refined Short-term Scheduling Method Considering the Difference of Peak-shaving Performance of Hydropower Stations
by: HUANG Kui, et al.
Published: (2024-01-01) -
Short-Term Optimal Scheduling Method of Cascade Hydropower Stations Based on Segmented Load Construction Strategy
by: LI Chonghao, et al.
Published: (2023-01-01) -
Short-term Optimal Scheduling Model for Hydropower Stations Considering Peak Shaving of Local and HVDC Receiving Power Grids
by: ZHOU Binbin, et al.
Published: (2024-01-01) -
Water Supply Scheduling for Cross-basin Reservoir Groups Based on Improved Scheduling Diagram
by: ZHAO Siqi, et al.
Published: (2023-01-01) -
Day-ahead Clearing Method for High-proportion Hydropower Electricity Market
by: ZHANG Yang, et al.
Published: (2023-01-01)