Addressing Due Date and Storage Restrictions in the S-Graph Scheduling Framework
This paper addresses the Flexible Job Shop Scheduling Problem (FJSP) with the objective of minimizing both earliness/tardiness (E/T) and intermediate storage time (IST). An extended S-graph framework that incorporates E/T and IST minimization while maintaining the structural advantages of the origin...
Saved in:
| Main Authors: | Krisztián Attila Bakon, Tibor Holczinger |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2025-02-01
|
| Series: | Machines |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2075-1702/13/2/131 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
job shop scheduling problem:literature review
by: Marrwa Abd-AlKareem Alabajee, et al.
Published: (2020-08-01) -
Computing Idle Times in Fuzzy Flexible Job Shop Scheduling
by: Pablo García Gómez, et al.
Published: (2025-03-01) -
Application of Levy flight-based harmony search algorithm for the flexible job shop scheduling
by: Jun Li, et al.
Published: (2025-05-01) -
An innovative genetic algorithm-based master schedule to optimize job shop scheduling problem
by: Thi Phuong Quyen Nguyen, et al.
Published: (2024-12-01) -
A Q-Learning Proposal for Tuning Genetic Algorithms in Flexible Job Shop Scheduling Problems
by: Christian Perez, et al.
Published: (2023-05-01)