An Outcome Overview of Housing Rehabilitation and Reconstruction in Mataram City Post Lombok Earthquake Disaster

Several strong earthquakes hit Lombok Island in 2018. The earthquake that occurred in sequence caused damage to many buildings and even destroyed housing for residents. This residential sector suffered enormous damage and losses in Mataram City, the province's capital. The reconstruction and re...

Full description

Saved in:
Bibliographic Details
Main Authors: Ni Nyoman Kencanawati, Buan Anshari, Eko Pradjoko, Rini Srikus Saptaningtyas, Teti Handayani
Format: Article
Language:English
Published: Semnan University 2024-05-01
Series:Journal of Rehabilitation in Civil Engineering
Subjects:
Online Access:https://civiljournal.semnan.ac.ir/article_7967_7eb7be4e63aa5b2f601997bcb665e300.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832592021139750912
author Ni Nyoman Kencanawati
Buan Anshari
Eko Pradjoko
Rini Srikus Saptaningtyas
Teti Handayani
author_facet Ni Nyoman Kencanawati
Buan Anshari
Eko Pradjoko
Rini Srikus Saptaningtyas
Teti Handayani
author_sort Ni Nyoman Kencanawati
collection DOAJ
description Several strong earthquakes hit Lombok Island in 2018. The earthquake that occurred in sequence caused damage to many buildings and even destroyed housing for residents. This residential sector suffered enormous damage and losses in Mataram City, the province's capital. The reconstruction and rehabilitation process was carried out in 2 phases, and the last Phase was completed in April 2021. A total of 14140 houses received assistance funds for repair and rebuilding in the first Phase, while the number of houses receiving repair funds in the second Phase was 1339. Compared to the initial data in the Reconstruction and Rehabilitation Action Plan, the number of major damaged houses decreased by 43.66% to 1350 houses. However, the number of medium and minor damaged houses increased to 30.75% and 10.83%, respectively, to 3631 and 9159 houses. Through the implementation of the housing reconstruction and rehabilitation in Mataram City, it can be concluded that either the funding or the process was under the central government's guidance. Meanwhile, the local government was an aid to ensure the effective implementation of reconstruction. The relationship between the central and local governments was conducive to running the process effectively and according to the timeline. The local government allows the community to choose the type of earthquake-resistance house for rebuilding. Of the various types of more earthquake-resistant houses, the people preferred the reinforced concrete panel type housing because the construction is faster, so they can live in it immediately.
format Article
id doaj-art-aba07414f10b4ec7b9e9fb3300e4dfd4
institution Kabale University
issn 2345-4415
2345-4423
language English
publishDate 2024-05-01
publisher Semnan University
record_format Article
series Journal of Rehabilitation in Civil Engineering
spelling doaj-art-aba07414f10b4ec7b9e9fb3300e4dfd42025-01-21T20:47:36ZengSemnan UniversityJournal of Rehabilitation in Civil Engineering2345-44152345-44232024-05-01122839610.22075/jrce.2023.28743.17357967An Outcome Overview of Housing Rehabilitation and Reconstruction in Mataram City Post Lombok Earthquake DisasterNi Nyoman Kencanawati0Buan Anshari1Eko Pradjoko2Rini Srikus Saptaningtyas3Teti Handayani4Civil Engineering Department, Engineering Faculty, University of Mataram, Jl. Majapahit 62 Mataram, 83125, IndonesiaCivil Engineering Department, Engineering Faculty, University of Mataram, Jl. Majapahit 62 Mataram, 83125, IndonesiaCivil Engineering Department, Engineering Faculty, University of Mataram, Jl. Majapahit 62 Mataram, 83125, IndonesiaArchitecture Study Program, Engineering Faculty, University of Mataram, Jl. Majapahit 62 Mataram, 83125, IndonesiaArchitecture Study Program, Engineering Faculty, University of Mataram, Jl. Majapahit 62 Mataram, 83125, IndonesiaSeveral strong earthquakes hit Lombok Island in 2018. The earthquake that occurred in sequence caused damage to many buildings and even destroyed housing for residents. This residential sector suffered enormous damage and losses in Mataram City, the province's capital. The reconstruction and rehabilitation process was carried out in 2 phases, and the last Phase was completed in April 2021. A total of 14140 houses received assistance funds for repair and rebuilding in the first Phase, while the number of houses receiving repair funds in the second Phase was 1339. Compared to the initial data in the Reconstruction and Rehabilitation Action Plan, the number of major damaged houses decreased by 43.66% to 1350 houses. However, the number of medium and minor damaged houses increased to 30.75% and 10.83%, respectively, to 3631 and 9159 houses. Through the implementation of the housing reconstruction and rehabilitation in Mataram City, it can be concluded that either the funding or the process was under the central government's guidance. Meanwhile, the local government was an aid to ensure the effective implementation of reconstruction. The relationship between the central and local governments was conducive to running the process effectively and according to the timeline. The local government allows the community to choose the type of earthquake-resistance house for rebuilding. Of the various types of more earthquake-resistant houses, the people preferred the reinforced concrete panel type housing because the construction is faster, so they can live in it immediately.https://civiljournal.semnan.ac.ir/article_7967_7eb7be4e63aa5b2f601997bcb665e300.pdfpost-disasterreconstruction and rehabilitation outcomepermanent housinglombok earthquake 2018disaster management agency
spellingShingle Ni Nyoman Kencanawati
Buan Anshari
Eko Pradjoko
Rini Srikus Saptaningtyas
Teti Handayani
An Outcome Overview of Housing Rehabilitation and Reconstruction in Mataram City Post Lombok Earthquake Disaster
Journal of Rehabilitation in Civil Engineering
post-disaster
reconstruction and rehabilitation outcome
permanent housing
lombok earthquake 2018
disaster management agency
title An Outcome Overview of Housing Rehabilitation and Reconstruction in Mataram City Post Lombok Earthquake Disaster
title_full An Outcome Overview of Housing Rehabilitation and Reconstruction in Mataram City Post Lombok Earthquake Disaster
title_fullStr An Outcome Overview of Housing Rehabilitation and Reconstruction in Mataram City Post Lombok Earthquake Disaster
title_full_unstemmed An Outcome Overview of Housing Rehabilitation and Reconstruction in Mataram City Post Lombok Earthquake Disaster
title_short An Outcome Overview of Housing Rehabilitation and Reconstruction in Mataram City Post Lombok Earthquake Disaster
title_sort outcome overview of housing rehabilitation and reconstruction in mataram city post lombok earthquake disaster
topic post-disaster
reconstruction and rehabilitation outcome
permanent housing
lombok earthquake 2018
disaster management agency
url https://civiljournal.semnan.ac.ir/article_7967_7eb7be4e63aa5b2f601997bcb665e300.pdf
work_keys_str_mv AT ninyomankencanawati anoutcomeoverviewofhousingrehabilitationandreconstructioninmataramcitypostlombokearthquakedisaster
AT buananshari anoutcomeoverviewofhousingrehabilitationandreconstructioninmataramcitypostlombokearthquakedisaster
AT ekopradjoko anoutcomeoverviewofhousingrehabilitationandreconstructioninmataramcitypostlombokearthquakedisaster
AT rinisrikussaptaningtyas anoutcomeoverviewofhousingrehabilitationandreconstructioninmataramcitypostlombokearthquakedisaster
AT tetihandayani anoutcomeoverviewofhousingrehabilitationandreconstructioninmataramcitypostlombokearthquakedisaster
AT ninyomankencanawati outcomeoverviewofhousingrehabilitationandreconstructioninmataramcitypostlombokearthquakedisaster
AT buananshari outcomeoverviewofhousingrehabilitationandreconstructioninmataramcitypostlombokearthquakedisaster
AT ekopradjoko outcomeoverviewofhousingrehabilitationandreconstructioninmataramcitypostlombokearthquakedisaster
AT rinisrikussaptaningtyas outcomeoverviewofhousingrehabilitationandreconstructioninmataramcitypostlombokearthquakedisaster
AT tetihandayani outcomeoverviewofhousingrehabilitationandreconstructioninmataramcitypostlombokearthquakedisaster