Single-Level Station Complex Structure for Application of Through Driving Construction Method

Metro Service has a huge impact on the development of urban transport infrastructure. The need to increase the efficiency of passenger transportation is caused by the rapid growth in passenger turnover as well as an increase in the distance from the outskirts of the city to the center. In connection...

Full description

Saved in:
Bibliographic Details
Main Authors: A. О. Kolikov, G. P. Pastushkov
Format: Article
Language:Russian
Published: Belarusian National Technical University 2020-10-01
Series:Наука и техника
Subjects:
Online Access:https://sat.bntu.by/jour/article/view/2365
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850117447397408768
author A. О. Kolikov
G. P. Pastushkov
author_facet A. О. Kolikov
G. P. Pastushkov
author_sort A. О. Kolikov
collection DOAJ
description Metro Service has a huge impact on the development of urban transport infrastructure. The need to increase the efficiency of passenger transportation is caused by the rapid growth in passenger turnover as well as an increase in the distance from the outskirts of the city to the center. In connection with the need to develop a metro service network in Minsk city, which is confirmed by research in the area of passenger traffic in the main areas of the city, the CSM Bessac tunnel boring machine was purchased, which allows significantly to increase the speed of  tunnel driving. The use of a mechanized tunnel boring machine in the traditional concept of the metro network construction, in which driving of tunnels is carried out after construction of stations, does not allow to use a shield with maximum economic efficiency due to the small extent of tunnels.  There is also a need to build assembly-shield chambers and carry out works on disassembling and  assembling  the shield. The application of the new concept developed by Yu. S. Frolov and called “through driving” is actual in the conditions of the use of a mechanized tunnel boring machine. Its essence lies in the continuous driving of tunnels on the line section under construction and the consecutive construction of each station complex as the tunnel boring machine passes through it. To implement the concept of “through driving”, it is relevant to use a semi-closed construction method, in which the floor structure is constructed in an open way, and the other elements are closed. The available solutions of the metro stations constructed while using a semi-closed method of work have been analyzed in the paper. A detailed analysis has been carried out with due account of the adaptation to the construction conditions in Minsk, and the development of structural elements and assemblies of the platform area of the station, which is a two-cantilever vault with a developed transom part, resting on pile-columns of a circular cross section. Forces from the open ring of flexible tunnels lining are supported by a cantilever part of an arch and a bottom plate. The paper considers a design of a metro station, its main elements, their purpose and specificity of work, as well as optimization issues and the results of the design feasibility study.
format Article
id doaj-art-aa63bda4aef249ea86a8f69dd30e7e02
institution OA Journals
issn 2227-1031
2414-0392
language Russian
publishDate 2020-10-01
publisher Belarusian National Technical University
record_format Article
series Наука и техника
spelling doaj-art-aa63bda4aef249ea86a8f69dd30e7e022025-08-20T02:36:06ZrusBelarusian National Technical UniversityНаука и техника2227-10312414-03922020-10-0119541342010.21122/2227-1031-2020-19-5-413-4202079Single-Level Station Complex Structure for Application of Through Driving Construction MethodA. О. Kolikov0G. P. Pastushkov1Belarusian National Technical UniversityBelarusian National Technical UniversityMetro Service has a huge impact on the development of urban transport infrastructure. The need to increase the efficiency of passenger transportation is caused by the rapid growth in passenger turnover as well as an increase in the distance from the outskirts of the city to the center. In connection with the need to develop a metro service network in Minsk city, which is confirmed by research in the area of passenger traffic in the main areas of the city, the CSM Bessac tunnel boring machine was purchased, which allows significantly to increase the speed of  tunnel driving. The use of a mechanized tunnel boring machine in the traditional concept of the metro network construction, in which driving of tunnels is carried out after construction of stations, does not allow to use a shield with maximum economic efficiency due to the small extent of tunnels.  There is also a need to build assembly-shield chambers and carry out works on disassembling and  assembling  the shield. The application of the new concept developed by Yu. S. Frolov and called “through driving” is actual in the conditions of the use of a mechanized tunnel boring machine. Its essence lies in the continuous driving of tunnels on the line section under construction and the consecutive construction of each station complex as the tunnel boring machine passes through it. To implement the concept of “through driving”, it is relevant to use a semi-closed construction method, in which the floor structure is constructed in an open way, and the other elements are closed. The available solutions of the metro stations constructed while using a semi-closed method of work have been analyzed in the paper. A detailed analysis has been carried out with due account of the adaptation to the construction conditions in Minsk, and the development of structural elements and assemblies of the platform area of the station, which is a two-cantilever vault with a developed transom part, resting on pile-columns of a circular cross section. Forces from the open ring of flexible tunnels lining are supported by a cantilever part of an arch and a bottom plate. The paper considers a design of a metro station, its main elements, their purpose and specificity of work, as well as optimization issues and the results of the design feasibility study.https://sat.bntu.by/jour/article/view/2365metrotunnel boring machinethrough drivingshallow metro stationconstruction processoptimizationfeasibility study
spellingShingle A. О. Kolikov
G. P. Pastushkov
Single-Level Station Complex Structure for Application of Through Driving Construction Method
Наука и техника
metro
tunnel boring machine
through driving
shallow metro station
construction process
optimization
feasibility study
title Single-Level Station Complex Structure for Application of Through Driving Construction Method
title_full Single-Level Station Complex Structure for Application of Through Driving Construction Method
title_fullStr Single-Level Station Complex Structure for Application of Through Driving Construction Method
title_full_unstemmed Single-Level Station Complex Structure for Application of Through Driving Construction Method
title_short Single-Level Station Complex Structure for Application of Through Driving Construction Method
title_sort single level station complex structure for application of through driving construction method
topic metro
tunnel boring machine
through driving
shallow metro station
construction process
optimization
feasibility study
url https://sat.bntu.by/jour/article/view/2365
work_keys_str_mv AT aokolikov singlelevelstationcomplexstructureforapplicationofthroughdrivingconstructionmethod
AT gppastushkov singlelevelstationcomplexstructureforapplicationofthroughdrivingconstructionmethod