Simplifying Multiproject Scheduling Problem Based on Design Structure Matrix and Its Solution by an Improved aiNet Algorithm
Managing multiple project is a complex task involving the unrelenting pressures of time and cost. Many studies have proposed various tools and techniques for single-project scheduling; however, the literature further considering multimode or multiproject issues occurring in the real world is rather...
Saved in:
| Main Authors: | Chunhua Ju, Tinggui Chen |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2012-01-01
|
| Series: | Discrete Dynamics in Nature and Society |
| Online Access: | http://dx.doi.org/10.1155/2012/713740 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Resource Unconstrained and Constrained Project Scheduling Problems and Practices in a Multiproject Environment
by: Marimuthu Kannimuthu, et al.
Published: (2018-01-01) -
Locality-Preserving Multiprojection Discriminant Analysis
by: Jiajun Ma
Published: (2025-03-01) -
PRINCIPLE OF POINT MAKING OFMUTUALLY ACCEPTABLE MULTIPROJECTION DECISION
by: Olga N. Lapaeva
Published: (2016-08-01) -
GenAINet: Enabling Wireless Collective Intelligence via Knowledge Transfer and Reasoning
by: Hang Zou, et al.
Published: (2025-01-01) -
Using of the simplified solutions of the problem of Stefan at designing of ray auxiliaries
by: Ju. A. Samoilovich, et al.
Published: (2002-11-01)