Progress in Sinopec shale oil engineering technology

With the continuous and further development in Sinopec shale oil exploitation, a series of characteristic technologies such as drilling, logging cementing and fracturing have been preliminarily formed. By the summary and analysis of the progress and achievements made by Sinopec in shale oil engineer...

Full description

Saved in:
Bibliographic Details
Main Author: ZHANG Jinhong
Format: Article
Language:zho
Published: Editorial Department of Petroleum Reservoir Evaluation and Development 2023-02-01
Series:Youqicang pingjia yu kaifa
Subjects:
Online Access:https://red.magtech.org.cn/fileup/2095-1426/PDF/1675063811632-1928451118.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850132192941834240
author ZHANG Jinhong
author_facet ZHANG Jinhong
author_sort ZHANG Jinhong
collection DOAJ
description With the continuous and further development in Sinopec shale oil exploitation, a series of characteristic technologies such as drilling, logging cementing and fracturing have been preliminarily formed. By the summary and analysis of the progress and achievements made by Sinopec in shale oil engineering technology during the "14th Five-Year Plan" period, the problems and challenges currently existing in shale oil development engineering technology are reviewed, and the technical countermeasures and development suggestions in the aspects of geological and drilling engineering integration, speed-up of drilling and completion, three-dimensional well development, and ultra-long horizontal wells are pointed out. Therefore, it promotes the development of shale oil engineering technology in China, realizes the low-cost, large-scale and cost-effective development of shale oil resources, and provides useful reference.
format Article
id doaj-art-aa16e190248e43a0af044c284a674f08
institution OA Journals
issn 2095-1426
language zho
publishDate 2023-02-01
publisher Editorial Department of Petroleum Reservoir Evaluation and Development
record_format Article
series Youqicang pingjia yu kaifa
spelling doaj-art-aa16e190248e43a0af044c284a674f082025-08-20T02:32:15ZzhoEditorial Department of Petroleum Reservoir Evaluation and DevelopmentYouqicang pingjia yu kaifa2095-14262023-02-011311810.13809/j.cnki.cn32-1825/te.2023.01.001Progress in Sinopec shale oil engineering technologyZHANG Jinhong0Sinopec Oilfield Service Corporation, Beijing 100020, ChinaWith the continuous and further development in Sinopec shale oil exploitation, a series of characteristic technologies such as drilling, logging cementing and fracturing have been preliminarily formed. By the summary and analysis of the progress and achievements made by Sinopec in shale oil engineering technology during the "14th Five-Year Plan" period, the problems and challenges currently existing in shale oil development engineering technology are reviewed, and the technical countermeasures and development suggestions in the aspects of geological and drilling engineering integration, speed-up of drilling and completion, three-dimensional well development, and ultra-long horizontal wells are pointed out. Therefore, it promotes the development of shale oil engineering technology in China, realizes the low-cost, large-scale and cost-effective development of shale oil resources, and provides useful reference.https://red.magtech.org.cn/fileup/2095-1426/PDF/1675063811632-1928451118.pdf|shale oil|geology-engineering integration|three-dimensional well pattern fracturing|ultra-long horizontal well|new progress
spellingShingle ZHANG Jinhong
Progress in Sinopec shale oil engineering technology
Youqicang pingjia yu kaifa
|shale oil|geology-engineering integration|three-dimensional well pattern fracturing|ultra-long horizontal well|new progress
title Progress in Sinopec shale oil engineering technology
title_full Progress in Sinopec shale oil engineering technology
title_fullStr Progress in Sinopec shale oil engineering technology
title_full_unstemmed Progress in Sinopec shale oil engineering technology
title_short Progress in Sinopec shale oil engineering technology
title_sort progress in sinopec shale oil engineering technology
topic |shale oil|geology-engineering integration|three-dimensional well pattern fracturing|ultra-long horizontal well|new progress
url https://red.magtech.org.cn/fileup/2095-1426/PDF/1675063811632-1928451118.pdf
work_keys_str_mv AT zhangjinhong progressinsinopecshaleoilengineeringtechnology