Development of Synchronous Transportation Model for Trackless Vehicle Dispatching During the Construction of Long-Distance Single-Headed Shield Tunnel
With the increasing demands for long-distance single-headed tunnels, trackless vehicles have been widely accepted for transporting construction materials from storage yard to working face. During the trackless transportation of construction materials, the synchronization of material supply and shiel...
Saved in:
Main Authors: | Jian Wu, Shao-Hui Tang, Chui-Yi Zhou, Yong Huang, Lei Huang, Hong-Bo Lu, Ning Miao |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2024-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2024/9650147 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Structural Monitoring of Metro Infrastructure during Shield Tunneling Construction
by: L. Ran, et al.
Published: (2014-01-01) -
Deformation and Reinforcement of the Existing Tunnel Affected by New Shield Tunnel Construction with Small Clearance
by: Junchao Zhang, et al.
Published: (2025-01-01) -
Research on the Reuse of Discharged Soil from EBP Shield Tunnels in Synchronous Grouting Material
by: Guijun Luo, et al.
Published: (2022-01-01) -
Risk Assessment of an Existing Metro Tunnel in Close Proximity to New Shield Tunnels following Construction
by: Yong Xu, et al.
Published: (2022-01-01) -
Study of the Construction Sequence of Overlapping Tunnels by the Shield Tunneling Method: A Case Study of the Longest Overlapping Tunnel in China
by: Zhiyong Yang, et al.
Published: (2020-01-01)