Risk Identification and Responses of Tunnel Construction Management during the COVID-19 Pandemic

The COVID-19 pandemic has brought about significant influences to the world, including tunnel construction. Based on the analysis of 12 tunnel construction projects, this paper identifies the specific risk factors related to the COVID-19 pandemic, e.g., men, materials, machines, methods, social envi...

Full description

Saved in:
Bibliographic Details
Main Authors: Zhimin Wang, Zixiao Liu, Junyan Liu
Format: Article
Language:English
Published: Wiley 2020-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2020/6620539
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832565876208959488
author Zhimin Wang
Zixiao Liu
Junyan Liu
author_facet Zhimin Wang
Zixiao Liu
Junyan Liu
author_sort Zhimin Wang
collection DOAJ
description The COVID-19 pandemic has brought about significant influences to the world, including tunnel construction. Based on the analysis of 12 tunnel construction projects, this paper identifies the specific risk factors related to the COVID-19 pandemic, e.g., men, materials, machines, methods, social environment, and political epidemic prevention pressure. Among these risk factors, worker availability, site accessibility, shortage of construction materials, and inadequate epidemic prevention materials caused by the lockdown policy are the most fundamental challenges encountered by the projects. Social panic and epidemic prevention policy requirements are key issues needed to be addressed before the resumption of construction work. The special circumstances caused by the COVID-19 pandemic called for flexible project management and coordination skills to raise suitable and effective response strategies, while local governments make substantial contributions in solving the difficulties. Although these measures have resulted in higher project costs, their effectiveness in catching up with project schedules is worthy of recognition. The findings of this study enrich the risk categories of tunnel construction and the risk response strategies from the perspective of a global pandemic. It implies that future construction schemes including design, budget, supply chain, and project management should consider the possible influence of an epidemic.
format Article
id doaj-art-a5a3f22d72b24b2fbbb1015acc062c4d
institution Kabale University
issn 1687-8086
1687-8094
language English
publishDate 2020-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-a5a3f22d72b24b2fbbb1015acc062c4d2025-02-03T01:06:22ZengWileyAdvances in Civil Engineering1687-80861687-80942020-01-01202010.1155/2020/66205396620539Risk Identification and Responses of Tunnel Construction Management during the COVID-19 PandemicZhimin Wang0Zixiao Liu1Junyan Liu2School of Accounting, Guangdong University of Foreign Studies, Guangzhou 510006, ChinaSchool of Accounting, Guangdong University of Foreign Studies, Guangzhou 510006, ChinaSchool of Economics and Management, Qingdao University of Science and Technology, Qingdao 266061, ChinaThe COVID-19 pandemic has brought about significant influences to the world, including tunnel construction. Based on the analysis of 12 tunnel construction projects, this paper identifies the specific risk factors related to the COVID-19 pandemic, e.g., men, materials, machines, methods, social environment, and political epidemic prevention pressure. Among these risk factors, worker availability, site accessibility, shortage of construction materials, and inadequate epidemic prevention materials caused by the lockdown policy are the most fundamental challenges encountered by the projects. Social panic and epidemic prevention policy requirements are key issues needed to be addressed before the resumption of construction work. The special circumstances caused by the COVID-19 pandemic called for flexible project management and coordination skills to raise suitable and effective response strategies, while local governments make substantial contributions in solving the difficulties. Although these measures have resulted in higher project costs, their effectiveness in catching up with project schedules is worthy of recognition. The findings of this study enrich the risk categories of tunnel construction and the risk response strategies from the perspective of a global pandemic. It implies that future construction schemes including design, budget, supply chain, and project management should consider the possible influence of an epidemic.http://dx.doi.org/10.1155/2020/6620539
spellingShingle Zhimin Wang
Zixiao Liu
Junyan Liu
Risk Identification and Responses of Tunnel Construction Management during the COVID-19 Pandemic
Advances in Civil Engineering
title Risk Identification and Responses of Tunnel Construction Management during the COVID-19 Pandemic
title_full Risk Identification and Responses of Tunnel Construction Management during the COVID-19 Pandemic
title_fullStr Risk Identification and Responses of Tunnel Construction Management during the COVID-19 Pandemic
title_full_unstemmed Risk Identification and Responses of Tunnel Construction Management during the COVID-19 Pandemic
title_short Risk Identification and Responses of Tunnel Construction Management during the COVID-19 Pandemic
title_sort risk identification and responses of tunnel construction management during the covid 19 pandemic
url http://dx.doi.org/10.1155/2020/6620539
work_keys_str_mv AT zhiminwang riskidentificationandresponsesoftunnelconstructionmanagementduringthecovid19pandemic
AT zixiaoliu riskidentificationandresponsesoftunnelconstructionmanagementduringthecovid19pandemic
AT junyanliu riskidentificationandresponsesoftunnelconstructionmanagementduringthecovid19pandemic