Risk Identification and Responses of Tunnel Construction Management during the COVID-19 Pandemic
The COVID-19 pandemic has brought about significant influences to the world, including tunnel construction. Based on the analysis of 12 tunnel construction projects, this paper identifies the specific risk factors related to the COVID-19 pandemic, e.g., men, materials, machines, methods, social envi...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/6620539 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832565876208959488 |
---|---|
author | Zhimin Wang Zixiao Liu Junyan Liu |
author_facet | Zhimin Wang Zixiao Liu Junyan Liu |
author_sort | Zhimin Wang |
collection | DOAJ |
description | The COVID-19 pandemic has brought about significant influences to the world, including tunnel construction. Based on the analysis of 12 tunnel construction projects, this paper identifies the specific risk factors related to the COVID-19 pandemic, e.g., men, materials, machines, methods, social environment, and political epidemic prevention pressure. Among these risk factors, worker availability, site accessibility, shortage of construction materials, and inadequate epidemic prevention materials caused by the lockdown policy are the most fundamental challenges encountered by the projects. Social panic and epidemic prevention policy requirements are key issues needed to be addressed before the resumption of construction work. The special circumstances caused by the COVID-19 pandemic called for flexible project management and coordination skills to raise suitable and effective response strategies, while local governments make substantial contributions in solving the difficulties. Although these measures have resulted in higher project costs, their effectiveness in catching up with project schedules is worthy of recognition. The findings of this study enrich the risk categories of tunnel construction and the risk response strategies from the perspective of a global pandemic. It implies that future construction schemes including design, budget, supply chain, and project management should consider the possible influence of an epidemic. |
format | Article |
id | doaj-art-a5a3f22d72b24b2fbbb1015acc062c4d |
institution | Kabale University |
issn | 1687-8086 1687-8094 |
language | English |
publishDate | 2020-01-01 |
publisher | Wiley |
record_format | Article |
series | Advances in Civil Engineering |
spelling | doaj-art-a5a3f22d72b24b2fbbb1015acc062c4d2025-02-03T01:06:22ZengWileyAdvances in Civil Engineering1687-80861687-80942020-01-01202010.1155/2020/66205396620539Risk Identification and Responses of Tunnel Construction Management during the COVID-19 PandemicZhimin Wang0Zixiao Liu1Junyan Liu2School of Accounting, Guangdong University of Foreign Studies, Guangzhou 510006, ChinaSchool of Accounting, Guangdong University of Foreign Studies, Guangzhou 510006, ChinaSchool of Economics and Management, Qingdao University of Science and Technology, Qingdao 266061, ChinaThe COVID-19 pandemic has brought about significant influences to the world, including tunnel construction. Based on the analysis of 12 tunnel construction projects, this paper identifies the specific risk factors related to the COVID-19 pandemic, e.g., men, materials, machines, methods, social environment, and political epidemic prevention pressure. Among these risk factors, worker availability, site accessibility, shortage of construction materials, and inadequate epidemic prevention materials caused by the lockdown policy are the most fundamental challenges encountered by the projects. Social panic and epidemic prevention policy requirements are key issues needed to be addressed before the resumption of construction work. The special circumstances caused by the COVID-19 pandemic called for flexible project management and coordination skills to raise suitable and effective response strategies, while local governments make substantial contributions in solving the difficulties. Although these measures have resulted in higher project costs, their effectiveness in catching up with project schedules is worthy of recognition. The findings of this study enrich the risk categories of tunnel construction and the risk response strategies from the perspective of a global pandemic. It implies that future construction schemes including design, budget, supply chain, and project management should consider the possible influence of an epidemic.http://dx.doi.org/10.1155/2020/6620539 |
spellingShingle | Zhimin Wang Zixiao Liu Junyan Liu Risk Identification and Responses of Tunnel Construction Management during the COVID-19 Pandemic Advances in Civil Engineering |
title | Risk Identification and Responses of Tunnel Construction Management during the COVID-19 Pandemic |
title_full | Risk Identification and Responses of Tunnel Construction Management during the COVID-19 Pandemic |
title_fullStr | Risk Identification and Responses of Tunnel Construction Management during the COVID-19 Pandemic |
title_full_unstemmed | Risk Identification and Responses of Tunnel Construction Management during the COVID-19 Pandemic |
title_short | Risk Identification and Responses of Tunnel Construction Management during the COVID-19 Pandemic |
title_sort | risk identification and responses of tunnel construction management during the covid 19 pandemic |
url | http://dx.doi.org/10.1155/2020/6620539 |
work_keys_str_mv | AT zhiminwang riskidentificationandresponsesoftunnelconstructionmanagementduringthecovid19pandemic AT zixiaoliu riskidentificationandresponsesoftunnelconstructionmanagementduringthecovid19pandemic AT junyanliu riskidentificationandresponsesoftunnelconstructionmanagementduringthecovid19pandemic |