Quality Control for Embankment Placement of Facing Rcokfill Dam of Gaotang Hydropower Station
Saved in:
| Main Author: | 余海瀚 |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2003-01-01
|
| Series: | Renmin Zhujiang |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47671084&Fpath=home&index=0 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Design of Concrete-face Rock-fill Dam in Deze Hydropower Station
by: YANG Jian-xue, et al.
Published: (2009-01-01) -
Design and Quality Control of Mix Proportion of Concrete for the Dam of Pinghu Hydropower Station
by: 杨林
Published: (2004-01-01) -
Construction Technology of Roller Compaction for the Dam of Shankou Ⅲ Hydropower Station
by: 蓝腾辉, et al.
Published: (2004-01-01) -
Treatment of Cracks in Dam Toe with Chemical Grouting for Gudongkou Hydropower Station
by: 杨学红, et al.
Published: (2002-01-01) -
Energy Dissipation And Erosion Control Design in Spillway Dam in Nansha Hydropower Station in Honghe River
by: WANG Meng, et al.
Published: (2006-01-01)