Construction of J.P. Magufuli Extradosed Cable-Stayed Bridge (3.0 km) at Mwanza, Tanzania, near Kigongo / Busisi Ferry
The J.P. Magufuli extradosed bridge is currently under construction. This bridge crossing Lake Victoria has an overall length of 3,000 m and a deck width of 28.45 m to accommodate 4 lanes of 3.5 m wide carriageways of vehicular traffic, a shoulder of 2.5 m+2.5 m for emergency parking and vehicle bre...
Saved in:
| Main Author: | Katelula Salum Kaswaga |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Editorial Department of Progress in Prestress Technology, Tongji University
2025-06-01
|
| Series: | 预应力技术 |
| Subjects: | |
| Online Access: | https://ptmc.tongji.edu.cn/yyljs/article/pdf/202502005 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Comparison of aluminum and tunnel formwork for high-rise construction
by: K. Ashwin, et al.
Published: (2025-05-01) -
Analysis of structures and movement parametres of self-climbing platforms and development prospects
by: F. R. Krupenin, et al.
Published: (2024-06-01) -
Self-compacting concrete with reduced formwork pressures
by: Jiří Němeček, et al.
Published: (2024-05-01) -
Identifying and evaluating the key impact factors of selecting formwork in high-rise building construction
by: Vu Hong Son Pham, et al.
Published: (2024-10-01) -
Review on Multifactorial Coupling Effects and the Time-Dependent Behavior of Lateral Pressure on Concrete Formworks
by: Kekuo Yuan, et al.
Published: (2025-08-01)