Full-Scale Full-Ring Experimental Study on Shield Tunnel Lining Structure with Innovative Segment Joints

[Objective] Presently, shield tunnel structures in China face challenges including local segment weakening, significant joint deformation, low construction efficiency and hindered automated assembly. Therefore, it is necessary to study the mechanical properties of shield tunnel structures with innov...

Full description

Saved in:
Bibliographic Details
Main Authors: ZHAO Mingying, HE Yingdao, WU Xinlin, ZHANG Zhaoyi, BAI Haiwen, LIU Xian
Format: Article
Language:zho
Published: Urban Mass Transit Magazine Press 2025-05-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.05.024.html
Tags: Add Tag
No Tags, Be the first to tag this record!