Analysis of accident and restoration times of 6-10 kV urban cable lines
With the growth of energy consumption in cities and the reliability of power supply systems, more and more attention is paid. One of the indicators of the reliability of power supply to consumers is the average time of the post-emergency restoration of the line. When operating cable lines, it is imp...
Saved in:
| Main Authors: | D. Petrov, V. Marugin, A. Petrov |
|---|---|
| Format: | Article |
| Language: | Russian |
| Published: |
North Caucasus Federal University
2022-04-01
|
| Series: | Вестник Северо-Кавказского федерального университета |
| Subjects: | |
| Online Access: | https://vestnikskfu.elpub.ru/jour/article/view/761 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
ANALYSIS OF ACCIDENT AND RESTORATION TIMES OF 6-10 KV URBAN CABLE LINES
by: D. Petrov, et al.
Published: (2022-02-01) -
INFLUENCE OF DELAYS WITH THE BEGINNING OF REPAIR OF CABLE LINES 6-10 KV ON THE DURATION OF REPAIR WORKS
by: D. Petrov, et al.
Published: (2022-02-01) -
Method of calculation of temperature parameters and servic life of cable lines with a voltage of 10 kV
by: I. I. Tsitson, et al.
Published: (2024-09-01) -
On the Expediency of Laying Cable Power Lines with a Voltage of 6–35 kV Outside Settlements Instead of Overhead Power Lines
by: M. A. Korotkevich, et al.
Published: (2022-10-01) -
Towards Determination of Inductive Resistances of Single-Core Cables with Voltage of up to 1 kV Insulated by Cross-Linked Polyethylene
by: V. N. Radkevich, et al.
Published: (2018-07-01)