Research on Lean Planning and Optimization for Precast Component Production Based on Discrete Event Simulation
Component factories are experiencing the problems associated with lean production, especially the accuracy of production time prediction and the unnecessary waste in terms of time and resource utilization. In order to solve these problems, a discrete event simulation- (DES-) based lean planning and...
Saved in:
Main Authors: | Zhenmin Yuan, Yaning Qiao, Yaru Guo, Yaowu Wang, Chen Chen, Wenshun Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/8814914 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Site Selection of Precast Concrete Component Factory Based on PCA and GIS
by: Shuqiang Wang, et al.
Published: (2022-01-01) -
Research on the Development Approach for Reusable Model in Parallel Discrete Event Simulation
by: Jianbo Li, et al.
Published: (2015-01-01) -
Optimization of Flow Shop Scheduling in Precast Concrete Component Production via Mixed-Integer Linear Programming
by: Zhansheng Liu, et al.
Published: (2021-01-01) -
Analyzing the Diverging Diamond Interchange Using Discrete Event Simulation
by: Michael Anderson, et al.
Published: (2012-01-01) -
Automatic Generation of Precast Concrete Component Fabrication Drawings Based on BIM and Multi-Agent Reinforcement Learning
by: Chao Zhang, et al.
Published: (2025-01-01)