Fixed start method for repetitive project scheduling with simulated annealing

This research deals with the high project completion variability by presenting a new method to decrease such variability in repetitive construction projects. To achieve this, a Fixed Start Method (FSM) —where the starts of each activity with a high level of probabilistic confidence for the planned p...

Full description

Saved in:
Bibliographic Details
Main Authors: Francisco Moreno, Eric Forcael, Francisco Orozco, Felipe Baesler, Duzgun Agdas
Format: Article
Language:English
Published: Elsevier 2025-01-01
Series:Heliyon
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S2405844025001215
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This research deals with the high project completion variability by presenting a new method to decrease such variability in repetitive construction projects. To achieve this, a Fixed Start Method (FSM) —where the starts of each activity with a high level of probabilistic confidence for the planned project duration are fixed— was applied, where the high level of probabilistic confidence obtained was optimized with the use of the metaheuristic algorithm called Simulated Annealing (SA). This procedure evaluated the project completion in a case study based on the coefficient of variance (COV) of the resulting standard deviation, mean, and temperature selected for the SA. Thus, the combined FSM and SA (FSSA) is a new method that decreases the variability of scheduling duration while achieving project completion times. Finally, the proposed FSSA method for construction scheduling was validated in a case study using Discrete Event Simulation.
ISSN:2405-8440