Construction Technology of Excavation and Blasting for Left Bank Abutment Slot of Xiaowan Hydropower Station
Saved in:
Main Authors: | LIU Hong-bao, GUO Guang-lin, XIE Na-na |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2005-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47666531&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis of Stability of Abutment in Arch Dam of Jintan Hydropower Station
by: CHEN Liang
Published: (2009-01-01) -
Stability Anlalysis for the Accumulation Body with High Slope on the Left Bank in Front of Xiaowan Dam
by: PAN Heng-yong, et al.
Published: (2000-01-01) -
Technique of Construction of F7 Hole in Fault Zone in Spillway Tunnel in Xiaowan Hydroelectricity Station
by: LI Wei, et al.
Published: (2009-01-01) -
Construction Design of the Honghua Hydropower Station
by: ZHANG Song-feng
Published: (2006-01-01) -
Stability Assessment of the Excavated Rock Slope at the Dagangshan Hydropower Station in China Based on Microseismic Monitoring
by: K. Ma, et al.
Published: (2018-01-01)