Hong-bao, L., Guang-lin, G., & Na-na, X. Construction Technology of Excavation and Blasting for Left Bank Abutment Slot of Xiaowan Hydropower Station. Editorial Office of Pearl River.
Chicago Style (17th ed.) CitationHong-bao, LIU, GUO Guang-lin, and XIE Na-na. Construction Technology of Excavation and Blasting for Left Bank Abutment Slot of Xiaowan Hydropower Station. Editorial Office of Pearl River.
MLA (9th ed.) CitationHong-bao, LIU, et al. Construction Technology of Excavation and Blasting for Left Bank Abutment Slot of Xiaowan Hydropower Station. Editorial Office of Pearl River.
Warning: These citations may not always be 100% accurate.