Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction
The tail void grouting is a key step in shield tunnel construction and has an important influence on the loading on the surrounding soil and on the resulting settlement. In order to estimate the ground surface settlement caused by tail void grouting pressure in tunnel construction, the loading on th...
Saved in:
| Main Authors: | Changsheng Wu, Zhiduo Zhu |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2018-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2018/3729143 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Probabilistic Evaluation of Grouting Reinforcement on Settlement Control Effectiveness in Shield Tunneling Construction
by: LAN Mulin, et al.
Published: (2024-12-01) -
Quantitative Evaluation of Ground Movements Caused by Grouting during Shield Tunnelling in Clay
by: Zhi-Feng Wang, et al.
Published: (2019-01-01) -
Raspberry Pi-Based IoT System for Grouting Void Detection in Tunnel Construction
by: Weibin Luo, et al.
Published: (2024-10-01) -
Innovative Grouting Reinforcement Techniques for Shield Tunnels: A Case Study on Surface Settlement Mitigation
by: Qiang Ma, et al.
Published: (2025-04-01) -
Machine learning-based forecasting of ground surface settlement induced by metro shield tunneling construction
by: Qiankun Wang, et al.
Published: (2024-12-01)