Assessing the Causes of Time Overrun in Building and Road Construction Projects: The Case of Addis Ababa City, Ethiopia
In recent years, the majority of the construction projects executed in Addis Ababa city experienced a varying magnitude of time overrun in which the projects become late in their completion. Due to different problems encountered during the inception, design, and implementation phases, the projects a...
Saved in:
Main Author: | Adamu Beyene Negesa |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2022-01-01
|
Series: | Journal of Engineering |
Online Access: | http://dx.doi.org/10.1155/2022/8479064 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The Usefulness of Adopting the Last Planner System in the Construction Process of Addis Ababa Road Projects
by: Zenawi Mehari Limenih, et al.
Published: (2022-01-01) -
Causes of cost overruns on Zimbabwe’s construction infrastructure projects
by: Tirivavi Moyo, et al.
Published: (2022-12-01) -
Distribution of causes of death and associated organ injuries in road traffic accident-related fatalities: a postmortem study in Addis Ababa, Ethiopia
by: Gashaw Sete, et al.
Published: (2025-01-01) -
Barriers to early diagnosis and treatment of cervical cancer in Addis Ababa, Ethiopia: qualitative study
by: Alem Gebremariam, et al.
Published: (2025-01-01) -
The evolution of green spaces within institutional plots in Yeka Sub-City, Addis Ababa, Ethiopia
by: Utant Debebe, et al.
Published: (2025-01-01)