A dataset of the operating station heat rate for 806 Indian coal plant units using machine learningZenodo
India aims to achieve net-zero emissions by 2070 and has set an ambitious target of 500 GW of renewable power generation capacity by 2030. As of 2025, coal-based power generation accounts for approximately 47 % of the total capacity and >70 % of the total electricity generation. Upgrading and dec...
Saved in:
| Main Authors: | Yifu Ding, Jansen Wong, Serena Patel, Guiyan Zang, Dharik Mallapragada |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Elsevier
2025-10-01
|
| Series: | Data in Brief |
| Subjects: | |
| Online Access: | http://www.sciencedirect.com/science/article/pii/S2352340925006638 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The cadenza woodwind dataset: Synthesised quartets for music information retrieval and machine learningZenodo
by: Gerardo Roa Dabike, et al.
Published: (2024-12-01) -
ONE OF THE WAYS TO RISE THE EFFICIENCY OF THE KISHINEV TOWN HEAT AND POWER STATIONS
by: Maximuk E.P.
Published: (2010-04-01) -
Progress of the Full Load Test of the Gasification Unit in IGCC Power Station
by: Haiming LI, et al.
Published: (2019-02-01) -
IS THERE ANY FUTURE FOR COAL POWER PLANTS IN EUROPE?
by: A. V. Zimakov
Published: (2017-11-01) -
OPTIMIZE THE PERFORMANCE OF ELECTRICAL EQUIPMENT IN GAS SEPARATION STATIONS (DEGASSING STATION DS ) AND ELECTRICAL SUBMERSIBLE PUMPS OF OIL EQUIPMENT FOR OIL RUMAILA FIELD
by: Majid Abdulhameed Abdulhy Al-Ali, et al.
Published: (2019-04-01)