Research and Application of an Innovative 110 Mining Method in Gob-Side Half Coal Rock Entry Retaining
In order to solve the problems of the high cost and time consumption of half coal rock entry driving, low coal recovery rate, and stress concentration on filling support body of retained entry along gob, the innovative 110 mining method based on pressure relief by roof cutting was adopted in 6302 th...
Saved in:
| Main Authors: | Eryu Wang, Xiangdong Chen, Xiaojie Yang |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2021-01-01
|
| Series: | Shock and Vibration |
| Online Access: | http://dx.doi.org/10.1155/2021/8228604 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Grouting Technique for Gob-Side Entry Retaining in Deep Mines
by: Xianyang Yu, et al.
Published: (2021-01-01) -
Distribution Law of Mining Stress of the Gob-Side Entry Retaining in Deep Mining Thin Coal Seam
by: Tao Qin, et al.
Published: (2021-01-01) -
Large Section of Soft Rock Gob-Side Entry Retaining Surrounding Rock Control
by: Xizhi Wang, et al.
Published: (2024-01-01) -
A Case Study on Gob-Side Entry Retaining Technology in the Deep Coal Mine of Xinjulong, China
by: Ping Wang, et al.
Published: (2020-01-01) -
Research on the Deformation and Control Technology of Surrounding Rock in Entry Retaining along the Gob Side
by: Meng Zhang, et al.
Published: (2020-01-01)