Comparison of IGDT, TOAT and STC Methods in Robust Planning of Transmission Network Expansion in the Presence of Uncertainties
Transmission network expansion planning (TNEP) is a classic issue in power system studies that has been studied many times. Aim of TNEP is providing enough capacity to transfer power from generation section to load centers in a reliable and economically efficient manner. The mission of this problem...
Saved in:
Main Author: | Shahriar Abbasi |
---|---|
Format: | Article |
Language: | fas |
Published: |
Semnan University
2024-04-01
|
Series: | مجله مدل سازی در مهندسی |
Subjects: | |
Online Access: | https://modelling.semnan.ac.ir/article_8373_c410607e5cbab14acd9f89e8a977cede.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Short Paper - A Note on Robust Combinatorial Optimization with Generalized Interval Uncertainty
by: Yaman, Hande
Published: (2023-06-01) -
Robust Combinatorial Optimization with Locally Budgeted Uncertainty
by: Goerigk, Marc, et al.
Published: (2021-05-01) -
Robust Sliding Mode Control of Robot Manipulators Using the Fourier Series Expansion in the Presence of Uncertainty
by: Abdullah Hadipoor, et al.
Published: (2024-02-01) -
An audio steganography algorithm based on segment-STC
by: Xueyuan ZHANG, et al.
Published: (2019-07-01) -
The levelized cost of energy in the presence of uncertainty on the offshore wind speed
by: J. Pablo Arenas-López, et al.
Published: (2025-01-01)