View Points on 2008 Edition of"Hydroelectricity Construction Work Acceptance Regulation"
Saved in:
| Main Authors: | LI Guang-kuo, FAN You-li |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2008-01-01
|
| Series: | Renmin Zhujiang |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47662716&Fpath=home&index=0 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
To Construction of Expendable Hydroelectric Power Station Characteristics and Their Timely Correction
by: V. Kh. Nasibov
Published: (2006-10-01) -
Projects and problems of construction of Terek hydroelectric power plant in 1909-1912
by: Rasul S. Gurtuev, et al.
Published: (2022-09-01) -
Predictive models for overall health of hydroelectric equipment based on multi-measurement point output
by: Liu Dong, et al.
Published: (2025-03-01) -
Mammal diversity before the construction of a hydroelectric power dam in southern Mexico
by: M. Briones-Salas, et al.
Published: (2025-02-01) -
Regional policy and hydroelectric resources
by: Franco Romerio
Published: (2008-03-01)