USULAN KEBIJAKAN PEMERIKSAAN PADA GARDU TRAKSI LRT PALEMBANG BERDASARKAN ANALISIS NILAI KEANDALAN DAN KETERSEDIAAN

The Palembang LRT, the first light rail transportation system in Indonesia, operates at the traction substation. This research aims to propose an optimal inspection policy based on reliability and availability values. The study found that the reliability of the 750 V output DC cubicle sub-equipment...

Full description

Saved in:
Bibliographic Details
Main Authors: Chandra Dwi Putra, Vani Virdyawan, Tri Desmana Rachmilda, I Wayan Suweca
Format: Article
Language:English
Published: University of Brawijaya 2025-05-01
Series:Rekayasa Mesin
Subjects:
Online Access:https://rekayasamesin.ub.ac.id/index.php/rm/article/view/1853
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850281374127226880
author Chandra Dwi Putra
Vani Virdyawan
Tri Desmana Rachmilda
I Wayan Suweca
author_facet Chandra Dwi Putra
Vani Virdyawan
Tri Desmana Rachmilda
I Wayan Suweca
author_sort Chandra Dwi Putra
collection DOAJ
description The Palembang LRT, the first light rail transportation system in Indonesia, operates at the traction substation. This research aims to propose an optimal inspection policy based on reliability and availability values. The study found that the reliability of the 750 V output DC cubicle sub-equipment is 84.01%, the feeder is 97.22%, the MV switchgear 20 kV AC is 98.60%, and the power supply controller (SCADA) is 94.04%. The availability value of the 750 V output DC cubicle sub-equipment is 99.99%, the feeder is 99.98%, the MV switchgear 20 kV AC is 99.99%, and the SCADA is 99.97%. The inspection time interval with a reliability target of 90% for the 750 V output DC cubicle sub-equipment is 181 hours, with the feeder sub-equipment having intervals of 1256 hours, MV switchgear 20 kV AC sub-equipment every 2513 hours, and the SCADA sub-equipment every 599 hours.
format Article
id doaj-art-9ec4b4d1fed14825b96fd73999380c58
institution OA Journals
issn 2338-1663
2477-6041
language English
publishDate 2025-05-01
publisher University of Brawijaya
record_format Article
series Rekayasa Mesin
spelling doaj-art-9ec4b4d1fed14825b96fd73999380c582025-08-20T01:48:20ZengUniversity of BrawijayaRekayasa Mesin2338-16632477-60412025-05-0116117919610.21776/d5cyfh091564USULAN KEBIJAKAN PEMERIKSAAN PADA GARDU TRAKSI LRT PALEMBANG BERDASARKAN ANALISIS NILAI KEANDALAN DAN KETERSEDIAANChandra Dwi Putra0Vani Virdyawan1Tri Desmana Rachmilda2I Wayan Suweca3Fakultas Teknik Mesin dan Dirgantara, Institut Teknologi Bandung, Bandung, INDONESIAFakultas Teknik Mesin dan Dirgantara, Institut Teknologi Bandung, Bandung, INDONESIASekolah Teknik Elektro dan Informatika, Institut Teknologi Bandung, Bandung, INDONESIAFakultas Teknik Mesin dan Dirgantara, Institut Teknologi Bandung, Bandung, INDONESIAThe Palembang LRT, the first light rail transportation system in Indonesia, operates at the traction substation. This research aims to propose an optimal inspection policy based on reliability and availability values. The study found that the reliability of the 750 V output DC cubicle sub-equipment is 84.01%, the feeder is 97.22%, the MV switchgear 20 kV AC is 98.60%, and the power supply controller (SCADA) is 94.04%. The availability value of the 750 V output DC cubicle sub-equipment is 99.99%, the feeder is 99.98%, the MV switchgear 20 kV AC is 99.99%, and the SCADA is 99.97%. The inspection time interval with a reliability target of 90% for the 750 V output DC cubicle sub-equipment is 181 hours, with the feeder sub-equipment having intervals of 1256 hours, MV switchgear 20 kV AC sub-equipment every 2513 hours, and the SCADA sub-equipment every 599 hours.https://rekayasamesin.ub.ac.id/index.php/rm/article/view/1853palembang lrttraction substationreliabilityavailabilityinspection time interval
spellingShingle Chandra Dwi Putra
Vani Virdyawan
Tri Desmana Rachmilda
I Wayan Suweca
USULAN KEBIJAKAN PEMERIKSAAN PADA GARDU TRAKSI LRT PALEMBANG BERDASARKAN ANALISIS NILAI KEANDALAN DAN KETERSEDIAAN
Rekayasa Mesin
palembang lrt
traction substation
reliability
availability
inspection time interval
title USULAN KEBIJAKAN PEMERIKSAAN PADA GARDU TRAKSI LRT PALEMBANG BERDASARKAN ANALISIS NILAI KEANDALAN DAN KETERSEDIAAN
title_full USULAN KEBIJAKAN PEMERIKSAAN PADA GARDU TRAKSI LRT PALEMBANG BERDASARKAN ANALISIS NILAI KEANDALAN DAN KETERSEDIAAN
title_fullStr USULAN KEBIJAKAN PEMERIKSAAN PADA GARDU TRAKSI LRT PALEMBANG BERDASARKAN ANALISIS NILAI KEANDALAN DAN KETERSEDIAAN
title_full_unstemmed USULAN KEBIJAKAN PEMERIKSAAN PADA GARDU TRAKSI LRT PALEMBANG BERDASARKAN ANALISIS NILAI KEANDALAN DAN KETERSEDIAAN
title_short USULAN KEBIJAKAN PEMERIKSAAN PADA GARDU TRAKSI LRT PALEMBANG BERDASARKAN ANALISIS NILAI KEANDALAN DAN KETERSEDIAAN
title_sort usulan kebijakan pemeriksaan pada gardu traksi lrt palembang berdasarkan analisis nilai keandalan dan ketersediaan
topic palembang lrt
traction substation
reliability
availability
inspection time interval
url https://rekayasamesin.ub.ac.id/index.php/rm/article/view/1853
work_keys_str_mv AT chandradwiputra usulankebijakanpemeriksaanpadagardutraksilrtpalembangberdasarkananalisisnilaikeandalandanketersediaan
AT vanivirdyawan usulankebijakanpemeriksaanpadagardutraksilrtpalembangberdasarkananalisisnilaikeandalandanketersediaan
AT tridesmanarachmilda usulankebijakanpemeriksaanpadagardutraksilrtpalembangberdasarkananalisisnilaikeandalandanketersediaan
AT iwayansuweca usulankebijakanpemeriksaanpadagardutraksilrtpalembangberdasarkananalisisnilaikeandalandanketersediaan