USULAN KEBIJAKAN PEMERIKSAAN PADA GARDU TRAKSI LRT PALEMBANG BERDASARKAN ANALISIS NILAI KEANDALAN DAN KETERSEDIAAN

The Palembang LRT, the first light rail transportation system in Indonesia, operates at the traction substation. This research aims to propose an optimal inspection policy based on reliability and availability values. The study found that the reliability of the 750 V output DC cubicle sub-equipment...

Full description

Saved in:
Bibliographic Details
Main Authors: Chandra Dwi Putra, Vani Virdyawan, Tri Desmana Rachmilda, I Wayan Suweca
Format: Article
Language:English
Published: University of Brawijaya 2025-05-01
Series:Rekayasa Mesin
Subjects:
Online Access:https://rekayasamesin.ub.ac.id/index.php/rm/article/view/1853
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The Palembang LRT, the first light rail transportation system in Indonesia, operates at the traction substation. This research aims to propose an optimal inspection policy based on reliability and availability values. The study found that the reliability of the 750 V output DC cubicle sub-equipment is 84.01%, the feeder is 97.22%, the MV switchgear 20 kV AC is 98.60%, and the power supply controller (SCADA) is 94.04%. The availability value of the 750 V output DC cubicle sub-equipment is 99.99%, the feeder is 99.98%, the MV switchgear 20 kV AC is 99.99%, and the SCADA is 99.97%. The inspection time interval with a reliability target of 90% for the 750 V output DC cubicle sub-equipment is 181 hours, with the feeder sub-equipment having intervals of 1256 hours, MV switchgear 20 kV AC sub-equipment every 2513 hours, and the SCADA sub-equipment every 599 hours.
ISSN:2338-1663
2477-6041