A Dual Resource Constrained Unrelated Parallel Machine Scheduling Model Considering Tardiness and Workload Balance
The proposed study pertains to Multi-Task Simultaneous Supervision Dual Resource Constrained (MTSSDRC), which considers minimizing tardiness and workload balance. The workload balance is calculated using the Workload Smoothness Index (WSI). Additionally, the research concentrates on unrelated paral...
Saved in:
| Main Authors: | Karina Amanda Larasati, Sukoyo Sukoyo, Muhammad Akbar |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Petra Christian University
2024-07-01
|
| Series: | Jurnal Teknik Industri |
| Subjects: | |
| Online Access: | https://jurnalindustri.petra.ac.id/index.php/ind/article/view/28061 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimized Green Unrelated Parallel Machine Scheduling Problem Subject to Preventive Maintenance
by: Najat Almasarwah
Published: (2025-02-01) -
Using SABC Algorithm for Scheduling Unrelated Parallel Batch Processing Machines Considering Deterioration Effects and Variable Maintenance
by: Ziyang Ji, et al.
Published: (2024-09-01) -
The effective management of teachers’ habitual tardiness: Protecting scheduled teaching time
by: Michael Moreti Mahome, et al.
Published: (2024-12-01) -
Actor–Critic Algorithm for the Dynamic Scheduling Problem of Unrelated Parallel Batch Machines
by: Xue Zhao, et al.
Published: (2024-09-01) -
Integrating Order Splitting and Acceptance with Batch Delivery in Parallel Machine Scheduling
by: Hanxing Cui, et al.
Published: (2024-09-01)