An Integrated Optimization Method for Resource-Constrained Schedule Compression Under Uncertainty in Construction Projects
An integrated solution that considers the shortening of scheduling and the planning of resource integration was conceived. The proposed method allocates the resources and the execution mode costs effectively in order to minimize the project duration and the cost of construction activities. Costs are...
Saved in:
| Main Authors: | Firas Takleef, Omar Ayadi, Faouzi Masmoudi |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2025-04-01
|
| Series: | Applied Sciences |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2076-3417/15/8/4089 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Multi-Project Scheduling with Uncertainty and Resource Flexibility: A Narrative Review and Exploration of Future Landscapes
by: Marzieh Aghileh, et al.
Published: (2025-05-01) -
A Development Model for Identifying the Uncertainty Sources and Their Impacts on Bridge Construction Projects
by: Kayvan Mohammadi Atashgah, et al.
Published: (2023-03-01) -
Multi-project scheduling under uncertainty and resource flexibility: a systematic literature review
by: Marzieh Aghileh, et al.
Published: (2024-12-01) -
Robust multi-objective optimization for water flooding under geological uncertainty
by: Abobakr Sori, et al.
Published: (2025-03-01) -
Presenting a multi-objective mathematical model with an integrated approach to scheduling and financial flow in production projects using NSGA-II
by: Sajad Janbaz, et al.
Published: (2023-11-01)