Equipment Layout Improvement for Large-Scale Hot Cell Facility Logistics

This study presents approaches to equipment layout improvement for a large-scale hot cell facility. First, the original facility layout and target process are introduced, including the basic information and specifications. Second, the flow of process materials is analyzed and the relationships are e...

Full description

Saved in:
Bibliographic Details
Main Authors: Seungnam Yu, Jaehoon Lim, Hunsuk Im, Hyojik Lee
Format: Article
Language:English
Published: Wiley 2017-01-01
Series:Science and Technology of Nuclear Installations
Online Access:http://dx.doi.org/10.1155/2017/4585120
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This study presents approaches to equipment layout improvement for a large-scale hot cell facility. First, the original facility layout and target process are introduced, including the basic information and specifications. Second, the flow of process materials is analyzed and the relationships are evaluated in detail using a “from-to chart” and a “relationship chart” for the original layout, and the logistics are simulated using the selected discrete event simulator to calculate the traveling distances of process materials handled by teleoperated material handling systems. Third, the original layout is modified using the total closeness rating (TCR), and the efficiency and usage of the material handling system are calculated and compared with the original case to evaluate the efficiency improvement of the modified layout. This modification process, which included load reduction, enabled those aspects of the material handling system that would need to be changed to be identified; these changes were suggested by a quantitative analysis of the logistics between each pair of stations and intuitive rearrangement based on charts and figures. These approaches could be an initial step in the large-scale hot cell design process, with future work to follow.
ISSN:1687-6075
1687-6083