Lower drive of continuous action unit to form underlying layer of road
Introduction. A continuous action unit for the formation of an underlying layer is designed to increase productivity in the construction of roads and other facilities, for which it is necessary to remove the top layer of soil. In the bucket of the continuous action unit to form an underlying layer o...
Saved in:
| Main Author: | V. A. Nikolaiev |
|---|---|
| Format: | Article |
| Language: | Russian |
| Published: |
Siberian State Automobile and Highway University
2021-03-01
|
| Series: | Вестник СибАДИ |
| Subjects: | |
| Online Access: | https://vestnik.sibadi.org/jour/article/view/1222 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Feasibility of continuous action unit parameters for road underlay formation
by: V. A. Nikolaev
Published: (2021-07-01) -
Energy expenditure on ground cutting by continuous action buckets to form the underlying layer of the road
by: V. A. Nikolaev
Published: (2020-12-01) -
Simulation of Induction Traction Drive with Supercapacitor Energy Storage System Test Bench
by: Stana Girts, et al.
Published: (2015-12-01) -
Dynamic Computation of an Innovative Device for Reducing Reaction Torque
by: Stelica Timofte, et al.
Published: (2024-11-01) -
Three-dimensional traction technology and its application in mechanomedicine
by: Xinman Chen, et al.
Published: (2025-09-01)