ANALYSIS OF DELAY FACTORS IN THE CONSTRUCTION PROJECT OF THE PROMOTION CENTER BUILDING AND BATIK DERIVATIVE PRODUCTION BUILDING IN PAMEKASAN
The construction of the Promotion Center Building and Written Batik Derivative Production Building is a development project with service provider PT. Hariz Three Sons. Tree Analysis (FTA) to determine the causes and impact of risk failure and Critical Path Method (CPM) to determine the extent to whi...
Saved in:
| Main Authors: | Ahmad Fatoni, Fairus Zabadi, Muhammad Saifuddin |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Department of Civil Engineering, Universitas Islam Malang
2023-12-01
|
| Series: | Journal Innovation of Civil Engineering |
| Online Access: | https://riset.unisma.ac.id/index.php/JICE/article/view/20554 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
ANALYSIS OF TRAFFIC ACCIDENTS ON RAYA PELTONG ROAD – ARTODUNG PAMEKASAN DISTRICT
by: Wasiluddin, et al.
Published: (2023-06-01) -
ANALYSIS OF COMPRESSIVE STRENGTH OF PAVING BLOCKS WITH THE ADDITION OF WOOD POWDER WASTE AND LIQUID LIME (CACO3)
by: Fairus Zabadi, et al.
Published: (2024-12-01) -
Measuring the Productivity and Environmental Performance of Pamekasan Batik Using the Concept of Green Productivity
by: Ika Deefi Anna, et al.
Published: (2025-02-01) -
EXPLORATION OF SCIENCE CONCEPTS IN KLAMPAR PAMEKASAN BATIK MOTIFS AS A SCIENCE LEARNING RESOURCE
by: Endang Sulastri, et al.
Published: (2025-05-01) -
Assessment of Factors Causing Construction Delays in Building Construction Projects in Somaliland
by: Abdisalam Yusuf Duale, et al.
Published: (2025-01-01)