ANALYSIS OF DELAY FACTORS IN THE CONSTRUCTION PROJECT OF THE PROMOTION CENTER BUILDING AND BATIK DERIVATIVE PRODUCTION BUILDING IN PAMEKASAN

The construction of the Promotion Center Building and Written Batik Derivative Production Building is a development project with service provider PT. Hariz Three Sons. Tree Analysis (FTA) to determine the causes and impact of risk failure and Critical Path Method (CPM) to determine the extent to whi...

Full description

Saved in:
Bibliographic Details
Main Authors: Ahmad Fatoni, Fairus Zabadi, Muhammad Saifuddin
Format: Article
Language:English
Published: Department of Civil Engineering, Universitas Islam Malang 2023-12-01
Series:Journal Innovation of Civil Engineering
Online Access:https://riset.unisma.ac.id/index.php/JICE/article/view/20554
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1849243546449608704
author Ahmad Fatoni
Fairus Zabadi
Muhammad Saifuddin
author_facet Ahmad Fatoni
Fairus Zabadi
Muhammad Saifuddin
author_sort Ahmad Fatoni
collection DOAJ
description The construction of the Promotion Center Building and Written Batik Derivative Production Building is a development project with service provider PT. Hariz Three Sons. Tree Analysis (FTA) to determine the causes and impact of risk failure and Critical Path Method (CPM) to determine the extent to which work experiences a critical path. The most dominant causal factors are factors caused by external factors, namely in the form of very high rainfall intensity in one month and unilateral blockades by village officials. The causal factor caused by the owner is the delay in submitting design changes to the field where the design is very important as a development guide. Meanwhile, delays caused by implementers are inappropriate duration determinations that result in work productivity not being properly controlled. Floor work and wall ornaments this work on the last day of the contract only produced 1.286% of the total 17.50%, which means there was a deviation of -16.211%. Floor work and wall ornaments have several work items including Install UK Polished Ceramic Floors. 60 x 60 cm, Install KM/WC Color Ceramic Floor 20 x 20 cm, Install Color Ceramic Wall 20 x 40 cm, Install 1 m ceramic plinth measuring 5 cm x 20 cm, Install 1 m2 Cutting Plate 5mm Thick Batik Motif + frame and Lettering Jobs.  Keywords: Project Delay Factors; Fault Tree Analysis (FTA); Critical Path Method (CPM).
format Article
id doaj-art-97fa266564cd436da1209904dca5576d
institution Kabale University
issn 2775-5592
language English
publishDate 2023-12-01
publisher Department of Civil Engineering, Universitas Islam Malang
record_format Article
series Journal Innovation of Civil Engineering
spelling doaj-art-97fa266564cd436da1209904dca5576d2025-08-20T03:59:26ZengDepartment of Civil Engineering, Universitas Islam MalangJournal Innovation of Civil Engineering2775-55922023-12-014222423310.33474/jice.v4i2.2055418106ANALYSIS OF DELAY FACTORS IN THE CONSTRUCTION PROJECT OF THE PROMOTION CENTER BUILDING AND BATIK DERIVATIVE PRODUCTION BUILDING IN PAMEKASANAhmad Fatoni0Fairus Zabadi1Muhammad Saifuddin2Universitas MaduraUniversitas MaduraUniversitas MaduraThe construction of the Promotion Center Building and Written Batik Derivative Production Building is a development project with service provider PT. Hariz Three Sons. Tree Analysis (FTA) to determine the causes and impact of risk failure and Critical Path Method (CPM) to determine the extent to which work experiences a critical path. The most dominant causal factors are factors caused by external factors, namely in the form of very high rainfall intensity in one month and unilateral blockades by village officials. The causal factor caused by the owner is the delay in submitting design changes to the field where the design is very important as a development guide. Meanwhile, delays caused by implementers are inappropriate duration determinations that result in work productivity not being properly controlled. Floor work and wall ornaments this work on the last day of the contract only produced 1.286% of the total 17.50%, which means there was a deviation of -16.211%. Floor work and wall ornaments have several work items including Install UK Polished Ceramic Floors. 60 x 60 cm, Install KM/WC Color Ceramic Floor 20 x 20 cm, Install Color Ceramic Wall 20 x 40 cm, Install 1 m ceramic plinth measuring 5 cm x 20 cm, Install 1 m2 Cutting Plate 5mm Thick Batik Motif + frame and Lettering Jobs.  Keywords: Project Delay Factors; Fault Tree Analysis (FTA); Critical Path Method (CPM).https://riset.unisma.ac.id/index.php/JICE/article/view/20554
spellingShingle Ahmad Fatoni
Fairus Zabadi
Muhammad Saifuddin
ANALYSIS OF DELAY FACTORS IN THE CONSTRUCTION PROJECT OF THE PROMOTION CENTER BUILDING AND BATIK DERIVATIVE PRODUCTION BUILDING IN PAMEKASAN
Journal Innovation of Civil Engineering
title ANALYSIS OF DELAY FACTORS IN THE CONSTRUCTION PROJECT OF THE PROMOTION CENTER BUILDING AND BATIK DERIVATIVE PRODUCTION BUILDING IN PAMEKASAN
title_full ANALYSIS OF DELAY FACTORS IN THE CONSTRUCTION PROJECT OF THE PROMOTION CENTER BUILDING AND BATIK DERIVATIVE PRODUCTION BUILDING IN PAMEKASAN
title_fullStr ANALYSIS OF DELAY FACTORS IN THE CONSTRUCTION PROJECT OF THE PROMOTION CENTER BUILDING AND BATIK DERIVATIVE PRODUCTION BUILDING IN PAMEKASAN
title_full_unstemmed ANALYSIS OF DELAY FACTORS IN THE CONSTRUCTION PROJECT OF THE PROMOTION CENTER BUILDING AND BATIK DERIVATIVE PRODUCTION BUILDING IN PAMEKASAN
title_short ANALYSIS OF DELAY FACTORS IN THE CONSTRUCTION PROJECT OF THE PROMOTION CENTER BUILDING AND BATIK DERIVATIVE PRODUCTION BUILDING IN PAMEKASAN
title_sort analysis of delay factors in the construction project of the promotion center building and batik derivative production building in pamekasan
url https://riset.unisma.ac.id/index.php/JICE/article/view/20554
work_keys_str_mv AT ahmadfatoni analysisofdelayfactorsintheconstructionprojectofthepromotioncenterbuildingandbatikderivativeproductionbuildinginpamekasan
AT fairuszabadi analysisofdelayfactorsintheconstructionprojectofthepromotioncenterbuildingandbatikderivativeproductionbuildinginpamekasan
AT muhammadsaifuddin analysisofdelayfactorsintheconstructionprojectofthepromotioncenterbuildingandbatikderivativeproductionbuildinginpamekasan