Maximum Control Water Level (CWL) Jatibarang Dam to Avoid The Possibility of Overtopping Due to Flood 100 Years
The study of the maximum water level control of the Jatibarang reservoir is to avoid the possibility of overtopping due to flooding after 100 years return period, therefore it is necessary to take into account the changes in land use, which were once shrubs turned into settlements. Changes in land u...
Saved in:
| Main Authors: | Yeri Sutopo, Karuniadi Satrijo Utomo |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Universitas Negeri Semarang
2019-10-01
|
| Series: | Jurnal Teknik Sipil dan Perencanaan |
| Subjects: | |
| Online Access: | https://journal.unnes.ac.id/nju/jtsp/article/view/20507 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Simulation of landslide dam failure due to overtopping considering vertical soil particles distribution
by: Tianlong Zhao, et al.
Published: (2024-12-01) -
Simulation of landslide dam failure due to overtopping considering wide-graded soil erosion
by: Gangyong Song, et al.
Published: (2024-11-01) -
Probability Analysis of Overtopping During Construction Period of Dam Based on Improved Interval Non-Probabilistic Reliability
by: Xinyan Guo, et al.
Published: (2025-06-01) -
A numerical investigation of irregular wave overtopping on a 2D fixed overtopping wave energy converter
by: Deping Cao, et al.
Published: (2025-12-01) -
Struktur Komunitas Plankton di Waduk Jatibarang
by: Aisya Prameswari Hanurandi, et al.
Published: (2022-10-01)