Identifying and Ranking the Risks Involved In the Construction Projects of High-Rise Buildings of Mashhad
The current research aims to identify and rank the risks involved in the construction projects of high-rise buildings of Mashhad using Analytic Hierarchy Process (AHP) model. To achieve the research objective, through reviewing the literature, the different criteria and dimensions of the risks invol...
Saved in:
| Main Authors: | , |
|---|---|
| Format: | Article |
| Language: | fas |
| Published: |
Assist. Prof. Dr. Roohollah Taherkhani
2019-02-01
|
| Series: | مهندسی و مدیریت ساخت |
| Subjects: | |
| Online Access: | https://www.jecm.ir/article_103645_97597736f3ed1e1d964b36c8fcbf01ea.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1849429669714067456 |
|---|---|
| author | Mahdi Jahanshahi Javaran Babak Panahi |
| author_facet | Mahdi Jahanshahi Javaran Babak Panahi |
| author_sort | Mahdi Jahanshahi Javaran |
| collection | DOAJ |
| description | The current research aims to identify and rank the risks involved in the construction projects of high-rise buildings of Mashhad using Analytic Hierarchy Process (AHP) model. To achieve the research objective, through reviewing the literature, the different criteria and dimensions of the risks involved in construction industry and high-rise building projects were identified and on the basis of those criteria and dimensions, the research questionnaire was prepared and its reliability and validity were verified. The statistical population consisted of the entire managers of the construction companies of high-rise building of Mashhad, which 45 individuals of them were identified and based on whole-counting sampling method, all of them were selected as the research statistical sample. After data collection, to answer the research questions, various analytical methods including Confirmatory Factor Analysis (CFA) and Analytic Hierarchy Process (AHP) were utilized. The generated results of CFA revealed that the existing risks in the construction projects of high-rise buildings can be categorized into two taxonomies of internal and external risks. The generated results of AHP indicated that the internal risks are more important than the external risks of the construction projects of high-rise buildings of Mashhad. |
| format | Article |
| id | doaj-art-959446e90cab4e5c927c06efd9b36977 |
| institution | Kabale University |
| issn | 2538-1903 2538-2578 |
| language | fas |
| publishDate | 2019-02-01 |
| publisher | Assist. Prof. Dr. Roohollah Taherkhani |
| record_format | Article |
| series | مهندسی و مدیریت ساخت |
| spelling | doaj-art-959446e90cab4e5c927c06efd9b369772025-08-20T03:28:17ZfasAssist. Prof. Dr. Roohollah Taherkhaniمهندسی و مدیریت ساخت2538-19032538-25782019-02-01344352103645Identifying and Ranking the Risks Involved In the Construction Projects of High-Rise Buildings of MashhadMahdi Jahanshahi Javaran0Babak Panahi1Nour Department, Iran University of Science & TechnologyRazak School of Engineering and Advanced Technology, Universiti Teknologi Malaysia (UTM), Kuala Lumpur, Malaysia.The current research aims to identify and rank the risks involved in the construction projects of high-rise buildings of Mashhad using Analytic Hierarchy Process (AHP) model. To achieve the research objective, through reviewing the literature, the different criteria and dimensions of the risks involved in construction industry and high-rise building projects were identified and on the basis of those criteria and dimensions, the research questionnaire was prepared and its reliability and validity were verified. The statistical population consisted of the entire managers of the construction companies of high-rise building of Mashhad, which 45 individuals of them were identified and based on whole-counting sampling method, all of them were selected as the research statistical sample. After data collection, to answer the research questions, various analytical methods including Confirmatory Factor Analysis (CFA) and Analytic Hierarchy Process (AHP) were utilized. The generated results of CFA revealed that the existing risks in the construction projects of high-rise buildings can be categorized into two taxonomies of internal and external risks. The generated results of AHP indicated that the internal risks are more important than the external risks of the construction projects of high-rise buildings of Mashhad.https://www.jecm.ir/article_103645_97597736f3ed1e1d964b36c8fcbf01ea.pdfriskhigh-rise buildingsmashhad |
| spellingShingle | Mahdi Jahanshahi Javaran Babak Panahi Identifying and Ranking the Risks Involved In the Construction Projects of High-Rise Buildings of Mashhad مهندسی و مدیریت ساخت risk high-rise buildings mashhad |
| title | Identifying and Ranking the Risks Involved In the Construction Projects of High-Rise Buildings of Mashhad |
| title_full | Identifying and Ranking the Risks Involved In the Construction Projects of High-Rise Buildings of Mashhad |
| title_fullStr | Identifying and Ranking the Risks Involved In the Construction Projects of High-Rise Buildings of Mashhad |
| title_full_unstemmed | Identifying and Ranking the Risks Involved In the Construction Projects of High-Rise Buildings of Mashhad |
| title_short | Identifying and Ranking the Risks Involved In the Construction Projects of High-Rise Buildings of Mashhad |
| title_sort | identifying and ranking the risks involved in the construction projects of high rise buildings of mashhad |
| topic | risk high-rise buildings mashhad |
| url | https://www.jecm.ir/article_103645_97597736f3ed1e1d964b36c8fcbf01ea.pdf |
| work_keys_str_mv | AT mahdijahanshahijavaran identifyingandrankingtherisksinvolvedintheconstructionprojectsofhighrisebuildingsofmashhad AT babakpanahi identifyingandrankingtherisksinvolvedintheconstructionprojectsofhighrisebuildingsofmashhad |