COMPARATIVE ANALYSIS OF PLASTERING WORK EXECUTION TIME ON LABOUR PRODUCTIVITY WITH WORK SAMPLING METHOD

Labor productivity is the main parameter in the success of a construction job. This study aims to analyze the level of productivity and the level of Labor Utilization Rate (LUR) in plastering work using the work sampling method, and the most effective time correlation between morning and afternoon....

Full description

Saved in:
Bibliographic Details
Main Authors: Dwi Dzulma Susanti, Fepy Supriani, Rena Misliniyati, Lindung Zalbuin Mase, Hardiansyah
Format: Article
Language:English
Published: Universitas Negeri Jakarta 2025-05-01
Series:Jurnal Pensil
Subjects:
Online Access:https://journal.unj.ac.id/unj/index.php/jpensil/article/view/54314
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850240022285910016
author Dwi Dzulma Susanti
Fepy Supriani
Rena Misliniyati
Lindung Zalbuin Mase
Hardiansyah
author_facet Dwi Dzulma Susanti
Fepy Supriani
Rena Misliniyati
Lindung Zalbuin Mase
Hardiansyah
author_sort Dwi Dzulma Susanti
collection DOAJ
description Labor productivity is the main parameter in the success of a construction job. This study aims to analyze the level of productivity and the level of Labor Utilization Rate (LUR) in plastering work using the work sampling method, and the most effective time correlation between morning and afternoon. This research was conducted by direct observation for 3 days. The results showed that the highest productivity value was 14.30 m²/hour in the afternoon, and the lowest productivity value was 6.86 m²/hour in the morning. The Labor Utilization Rate (LUR) values in the morning and afternoon were 57.9% and 65.9%, indicating that the afternoon time was more effective than the morning time. However, there was a significant difference in productivity between morning and afternoon time overall, and it can still be categorized as effective with a Labor Utilization Rate (LUR) value of 61.9%, which exceeds 50%.
format Article
id doaj-art-94d00b01ca3441899fc0487df37ce783
institution OA Journals
issn 2301-8437
2623-1085
language English
publishDate 2025-05-01
publisher Universitas Negeri Jakarta
record_format Article
series Jurnal Pensil
spelling doaj-art-94d00b01ca3441899fc0487df37ce7832025-08-20T02:00:59ZengUniversitas Negeri JakartaJurnal Pensil2301-84372623-10852025-05-0114210.21009/jpensil.v14i2.54314COMPARATIVE ANALYSIS OF PLASTERING WORK EXECUTION TIME ON LABOUR PRODUCTIVITY WITH WORK SAMPLING METHODDwi Dzulma Susanti0Fepy Supriani1Rena Misliniyati2Lindung Zalbuin Mase3Hardiansyah4State University of BengkuluState University of BengkuluState University of BengkuluState University of BengkuluState University of Bengkulu Labor productivity is the main parameter in the success of a construction job. This study aims to analyze the level of productivity and the level of Labor Utilization Rate (LUR) in plastering work using the work sampling method, and the most effective time correlation between morning and afternoon. This research was conducted by direct observation for 3 days. The results showed that the highest productivity value was 14.30 m²/hour in the afternoon, and the lowest productivity value was 6.86 m²/hour in the morning. The Labor Utilization Rate (LUR) values in the morning and afternoon were 57.9% and 65.9%, indicating that the afternoon time was more effective than the morning time. However, there was a significant difference in productivity between morning and afternoon time overall, and it can still be categorized as effective with a Labor Utilization Rate (LUR) value of 61.9%, which exceeds 50%. https://journal.unj.ac.id/unj/index.php/jpensil/article/view/54314ProductivityWork samplingLabor Utilization Rateplastering
spellingShingle Dwi Dzulma Susanti
Fepy Supriani
Rena Misliniyati
Lindung Zalbuin Mase
Hardiansyah
COMPARATIVE ANALYSIS OF PLASTERING WORK EXECUTION TIME ON LABOUR PRODUCTIVITY WITH WORK SAMPLING METHOD
Jurnal Pensil
Productivity
Work sampling
Labor Utilization Rate
plastering
title COMPARATIVE ANALYSIS OF PLASTERING WORK EXECUTION TIME ON LABOUR PRODUCTIVITY WITH WORK SAMPLING METHOD
title_full COMPARATIVE ANALYSIS OF PLASTERING WORK EXECUTION TIME ON LABOUR PRODUCTIVITY WITH WORK SAMPLING METHOD
title_fullStr COMPARATIVE ANALYSIS OF PLASTERING WORK EXECUTION TIME ON LABOUR PRODUCTIVITY WITH WORK SAMPLING METHOD
title_full_unstemmed COMPARATIVE ANALYSIS OF PLASTERING WORK EXECUTION TIME ON LABOUR PRODUCTIVITY WITH WORK SAMPLING METHOD
title_short COMPARATIVE ANALYSIS OF PLASTERING WORK EXECUTION TIME ON LABOUR PRODUCTIVITY WITH WORK SAMPLING METHOD
title_sort comparative analysis of plastering work execution time on labour productivity with work sampling method
topic Productivity
Work sampling
Labor Utilization Rate
plastering
url https://journal.unj.ac.id/unj/index.php/jpensil/article/view/54314
work_keys_str_mv AT dwidzulmasusanti comparativeanalysisofplasteringworkexecutiontimeonlabourproductivitywithworksamplingmethod
AT fepysupriani comparativeanalysisofplasteringworkexecutiontimeonlabourproductivitywithworksamplingmethod
AT renamisliniyati comparativeanalysisofplasteringworkexecutiontimeonlabourproductivitywithworksamplingmethod
AT lindungzalbuinmase comparativeanalysisofplasteringworkexecutiontimeonlabourproductivitywithworksamplingmethod
AT hardiansyah comparativeanalysisofplasteringworkexecutiontimeonlabourproductivitywithworksamplingmethod