Solving multi-objective green flexible job-shop scheduling problem considering operation sequence flexibility
The traditional flexible job-shop scheduling problem ([Formula: see text]) typically operates under the assumption that the product operations must follow a strict sequence, meaning that an operation can only begin once its preceding operation is finished. Nevertheless, in real-world production envi...
Saved in:
| Main Author: | Najat Almasarwah |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Taylor & Francis Group
2025-12-01
|
| Series: | International Journal of Sustainable Engineering |
| Subjects: | |
| Online Access: | https://www.tandfonline.com/doi/10.1080/19397038.2025.2507916 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Computing Idle Times in Fuzzy Flexible Job Shop Scheduling
by: Pablo García Gómez, et al.
Published: (2025-03-01) -
job shop scheduling problem:literature review
by: Marrwa Abd-AlKareem Alabajee, et al.
Published: (2020-08-01) -
Application of Levy flight-based harmony search algorithm for the flexible job shop scheduling
by: Jun Li, et al.
Published: (2025-05-01) -
Solving Flexible Job-Shop Scheduling Problems Based on Quantum Computing
by: Kaihan Fu, et al.
Published: (2025-02-01) -
Research on Flexible Job Shop Scheduling Method for Agricultural Equipment Considering Multi-Resource Constraints
by: Zhangliang Wei, et al.
Published: (2025-02-01)