Optimization of Generator Arrangement for Jin-Zhong HVDC

The paper proposes an optimization method which gives the minimum on-service generator number during the low-water and low-load period on the basis that the power system is safe and stable. The optimization considers three aspects, effective short circuit ratio, stability under island mode and low-o...

Full description

Saved in:
Bibliographic Details
Main Authors: Huifan XIE, Yong MEI, Jian ZHOU, Guanghu XU, Lei HUANG, Ming LI, Xiaobin ZHAO, Jian YANG
Format: Article
Language:zho
Published: State Grid Energy Research Institute 2020-10-01
Series:Zhongguo dianli
Subjects:
Online Access:https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.201805153
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850227438464794624
author Huifan XIE
Yong MEI
Jian ZHOU
Guanghu XU
Lei HUANG
Ming LI
Xiaobin ZHAO
Jian YANG
author_facet Huifan XIE
Yong MEI
Jian ZHOU
Guanghu XU
Lei HUANG
Ming LI
Xiaobin ZHAO
Jian YANG
author_sort Huifan XIE
collection DOAJ
description The paper proposes an optimization method which gives the minimum on-service generator number during the low-water and low-load period on the basis that the power system is safe and stable. The optimization considers three aspects, effective short circuit ratio, stability under island mode and low-order resonance. It is found that the introduction of active DC blocking during isolated operation mode can help effectively eliminate the risk of shortage of short-circuit current, power oscillations and low-order resonance. Operational practice suggests that the minimum on-service generator number of Liyuan and Ahai power plants can be reduced to two respectively when the proposed approach is applied. By reducing the on-service generator number, the risk of having generators operate without load during the low-water and low-load period is alleviated substantially, thus ensuring the safety of equipment of power plants during island mode.
format Article
id doaj-art-9394fc8be67444d5b483654d72ffa9f1
institution OA Journals
issn 1004-9649
language zho
publishDate 2020-10-01
publisher State Grid Energy Research Institute
record_format Article
series Zhongguo dianli
spelling doaj-art-9394fc8be67444d5b483654d72ffa9f12025-08-20T02:04:51ZzhoState Grid Energy Research InstituteZhongguo dianli1004-96492020-10-01531018018610.11930/j.issn.1004-9649.201805153zgdl-53-6-xiehufanOptimization of Generator Arrangement for Jin-Zhong HVDCHuifan XIE0Yong MEI1Jian ZHOU2Guanghu XU3Lei HUANG4Ming LI5Xiaobin ZHAO6Jian YANG7Power Dispatch and Control Center of China Southern Power Grid, Guangzhou 510623, ChinaPower Dispatch and Control Center of China Southern Power Grid, Guangzhou 510623, ChinaPower Dispatch and Control Center of China Southern Power Grid, Guangzhou 510623, ChinaPower Dispatch and Control Center of China Southern Power Grid, Guangzhou 510623, ChinaPower Dispatch and Control Center of China Southern Power Grid, Guangzhou 510623, ChinaSouthern Power Grid Science Research Institute, Guangzhou 510623, ChinaSouthern Power Grid Science Research Institute, Guangzhou 510623, ChinaSouthern Power Grid Science Research Institute, Guangzhou 510623, ChinaThe paper proposes an optimization method which gives the minimum on-service generator number during the low-water and low-load period on the basis that the power system is safe and stable. The optimization considers three aspects, effective short circuit ratio, stability under island mode and low-order resonance. It is found that the introduction of active DC blocking during isolated operation mode can help effectively eliminate the risk of shortage of short-circuit current, power oscillations and low-order resonance. Operational practice suggests that the minimum on-service generator number of Liyuan and Ahai power plants can be reduced to two respectively when the proposed approach is applied. By reducing the on-service generator number, the risk of having generators operate without load during the low-water and low-load period is alleviated substantially, thus ensuring the safety of equipment of power plants during island mode.https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.201805153short-circuit currentgenerator arrangement optimizationisland operationsecond-order resonanceactive blocking strategy
spellingShingle Huifan XIE
Yong MEI
Jian ZHOU
Guanghu XU
Lei HUANG
Ming LI
Xiaobin ZHAO
Jian YANG
Optimization of Generator Arrangement for Jin-Zhong HVDC
Zhongguo dianli
short-circuit current
generator arrangement optimization
island operation
second-order resonance
active blocking strategy
title Optimization of Generator Arrangement for Jin-Zhong HVDC
title_full Optimization of Generator Arrangement for Jin-Zhong HVDC
title_fullStr Optimization of Generator Arrangement for Jin-Zhong HVDC
title_full_unstemmed Optimization of Generator Arrangement for Jin-Zhong HVDC
title_short Optimization of Generator Arrangement for Jin-Zhong HVDC
title_sort optimization of generator arrangement for jin zhong hvdc
topic short-circuit current
generator arrangement optimization
island operation
second-order resonance
active blocking strategy
url https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.201805153
work_keys_str_mv AT huifanxie optimizationofgeneratorarrangementforjinzhonghvdc
AT yongmei optimizationofgeneratorarrangementforjinzhonghvdc
AT jianzhou optimizationofgeneratorarrangementforjinzhonghvdc
AT guanghuxu optimizationofgeneratorarrangementforjinzhonghvdc
AT leihuang optimizationofgeneratorarrangementforjinzhonghvdc
AT mingli optimizationofgeneratorarrangementforjinzhonghvdc
AT xiaobinzhao optimizationofgeneratorarrangementforjinzhonghvdc
AT jianyang optimizationofgeneratorarrangementforjinzhonghvdc