Design and Application of Double Row Steel Sheet Pile Cofferdam in Diversion of Embankment Construction
Saved in:
Main Authors: | YANG Kui, LUO Zhian |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2023-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.S2.032 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Application of Rotary Gunite Wall in Sheet Pile Cofferdam of a Certain Ship Yard
by: 张震, et al.
Published: (2005-01-01) -
Experimental Study on Bending Moment of Double-Row Steel Pipe Piles in Foundation Excavation
by: Ming-yi Zhang, et al.
Published: (2020-01-01) -
Construction of Sheet Piles in Sections Built on Deep Mud Bed for Pearl River Embankment Project in Guangzhou
by: 郑航桅
Published: (2004-01-01) -
Active and Passive Earth Pressure Calculation Method for Double-Row Piles considering the Nonlinear Pile Deformation
by: Yijun Zhou, et al.
Published: (2022-01-01) -
Influence of Riverbed Pre-excavation on Local Scour of Pile Foundation Upstream of Cofferdam
by: LIU Congcong, et al.
Published: (2021-01-01)