Causes, Effects, and Mitigation Measures of Time and Cost Overruns in Water Supply Projects: Case of Tigrai Region, Northern Ethiopia
Project cost overrun and schedule delay are major and widespread problems in the construction industry. In Tigrai, most water supply construction projects are not completed within the predetermined contract time and planned budget. Hence, this research was carried out to investigate the causes and e...
Saved in:
| Main Authors: | Lielti Gebreegziabher Berihu, Berhane Grum, Zeru Tariku, Bizuneh Asfaw Abebe |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2023-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2023/7113730 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Applicability and Cost Implication of Labor-Based Methods for Sustainable Road Maintenance (SRM) in Developing Countries
by: Berhane Grum, et al.
Published: (2023-01-01) -
Petrogenesis of the Adigrat basalts from the Oligocene Ethiopian flood basalt province in Tigrai, Northern Ethiopia
by: Angesom Resom, et al.
Published: (2025-06-01) -
Conflict and households’ acute food insecurity: evidences from the ongoing war in Tigrai-Northern Ethiopia
by: Teka Araya, et al.
Published: (2024-12-01) -
Area exclosure improved honey bee flora diversity and regeneration:- the case of Southern Tigrai, northern Ethiopia
by: Tesfay Atsbha, et al.
Published: (2025-04-01) -
Multi-Index Assessment of Hydrometeorological Droughts in the Tekeze River Basin, Northwestern Ethiopia
by: Teame Yisfa, et al.
Published: (2024-01-01)