Quantifying Schedule Delay Risk in Construction Projects: A Data-Driven Approach with BIM and Probabilistic Reliability Analysis
Progress management is an important scheme of construction management. In practical affairs, many unknown factors may lead to potential project delays and make the schedule risky. To address this issue, this paper proposes a data-driven construction progress evaluation method that employs a probabil...
Saved in:
| Main Authors: | Shen Zhang, Xingyu Wang |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2023-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2023/5525655 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Mapping BIM Uses for Risk Mitigation in International Construction Projects
by: Tsenguun Ganbat, et al.
Published: (2020-01-01) -
Assessing the risks of using Building Information Modeling (BIM) in construction projects
by: Farzad Fani, et al.
Published: (2020-11-01) -
Quality and reliability of IFC/BIM models for public educational facilities construction projects via clash detection
by: Michał Juszczyk, et al.
Published: (2025-01-01) -
Application of BIM and Internet of Things Technology in Material Management of Construction Projects
by: Wangchao Shen
Published: (2022-01-01) -
CHARACTERISING BIM-BASED CONSTRUCTION PROJECTS: A STRATEGIC AND CONTINGENT BIM APPLICATION MODEL
by: Oluseye Olugboyega, et al.
Published: (2019-09-01)