Estimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM
Offer preparation has always been a specific part of a building process which has significant impact on company business. Due to the fact that income greatly depends on offer’s precision and the balance between planned costs, both direct and overheads, and wished profit, it is necessary to prepare a...
Saved in:
Main Authors: | Igor Peško, Vladimir Mučenski, Miloš Šešlija, Nebojša Radović, Aleksandra Vujkov, Dragana Bibić, Milena Krklješ |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2017-01-01
|
Series: | Complexity |
Online Access: | http://dx.doi.org/10.1155/2017/2450370 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Road Surface State Recognition Based on SVM Optimization and Image Segmentation Processing
by: Jiandong Zhao, et al.
Published: (2017-01-01) -
ANN-based software cost estimation with input from COCOMO: CANN model
by: Chaudhry Hamza Rashid, et al.
Published: (2025-02-01) -
Anne Sexton
by: Santiago Matías
Published: (2014-01-01) -
Advancing risk assessment in renewable power plant construction: an integrated DEA-SVM approach
by: Reza Rasinojehdehi, et al.
Published: (2024-03-01) -
Digital Twins and Road Construction Using Secondary Raw Materials
by: Sebastjan Meža, et al.
Published: (2021-01-01)