Management strategy design, construction and project supervision The emergency plan for river protection kan

Emergency projects require suitabie and efficient management . Target of project is to operate it in minimum time nice quality .Common tripartite methods or other ones in order to kan river urgent protecting like BUY BAKE and soon are not fruitful . So to perform kan River Emergency project ( plan)...

Full description

Saved in:
Bibliographic Details
Main Authors: Iraj Hassani Fakhrabadi, Behnod Barmayehvar
Format: Article
Language:fas
Published: Assist. Prof. Dr. Roohollah Taherkhani 2017-08-01
Series:مهندسی و مدیریت ساخت
Subjects:
Online Access:https://www.jecm.ir/article_156593_ace796d337ae3cf98cd86b964add55d4.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Emergency projects require suitabie and efficient management . Target of project is to operate it in minimum time nice quality .Common tripartite methods or other ones in order to kan river urgent protecting like BUY BAKE and soon are not fruitful . So to perform kan River Emergency project ( plan) , firstly agreement and the contract encounters important changes and regarding to add design consultant beside the performer ( contractor ) in one side and on the other hand , main (hard ) design consultant beside the main employer , ordinary tripartite method has been thrown aside . To accelerate project performing , design administration and observation section have been delegated to present team at the project area; simultaneously we define strategy design management , observation and controlling based on probable changes stem form environmental conditions in the shortest possible time . The assigned time of the project is six months and in case of management and performance method , it has been started in design , construction with financial supply by contractor and consultant . In this article , we strategy of 0peration management , its advantages and disadvantages . At last but not least as a conclusion some tips to improve the project operation are recommended .