Integrated Urban Design Methodology of “Planning-Construction-Management” and Intelligent Management and Control Based on Teaching Reproduction Robot

With regard to the problems in the integrated urban construction based on “planning-construction–management,” the main issues that include the tight construction cycle, the high operation standards, the relatively extensive range of management data sources, the uneven information control, the relati...

Full description

Saved in:
Bibliographic Details
Main Author: Haipeng Wang
Format: Article
Language:English
Published: Wiley 2022-01-01
Series:Journal of Robotics
Online Access:http://dx.doi.org/10.1155/2022/4669792
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1849403410683527168
author Haipeng Wang
author_facet Haipeng Wang
author_sort Haipeng Wang
collection DOAJ
description With regard to the problems in the integrated urban construction based on “planning-construction–management,” the main issues that include the tight construction cycle, the high operation standards, the relatively extensive range of management data sources, the uneven information control, the relatively significant difficulty of management and control, and so on. In this paper, an integrated urban system of “planning-construction-management” based on the management level of the construction projects is established mainly through the application of the teaching reproduction robot (TRR), the engineering information, management and control procedures, and the system framework and performance. Among them, the management and control cover the design control, the quality supervision, the schedule control module, the safety control, the video monitoring, and the facility movement control. The digital technology is included to achieve an integrated management and control model for the engineering design, construction, and operation in its practical operational form. The introduction of the management and control described above has led to relatively good results for the project by operating on the road project with a public-private partnership (PPP) in the startup area of the Chengdu Tianfu International Airport New Town.
format Article
id doaj-art-8eee8dbe98f348e2af59ec5b0a67e00d
institution Kabale University
issn 1687-9619
language English
publishDate 2022-01-01
publisher Wiley
record_format Article
series Journal of Robotics
spelling doaj-art-8eee8dbe98f348e2af59ec5b0a67e00d2025-08-20T03:37:16ZengWileyJournal of Robotics1687-96192022-01-01202210.1155/2022/4669792Integrated Urban Design Methodology of “Planning-Construction-Management” and Intelligent Management and Control Based on Teaching Reproduction RobotHaipeng Wang0School of ArchitectureWith regard to the problems in the integrated urban construction based on “planning-construction–management,” the main issues that include the tight construction cycle, the high operation standards, the relatively extensive range of management data sources, the uneven information control, the relatively significant difficulty of management and control, and so on. In this paper, an integrated urban system of “planning-construction-management” based on the management level of the construction projects is established mainly through the application of the teaching reproduction robot (TRR), the engineering information, management and control procedures, and the system framework and performance. Among them, the management and control cover the design control, the quality supervision, the schedule control module, the safety control, the video monitoring, and the facility movement control. The digital technology is included to achieve an integrated management and control model for the engineering design, construction, and operation in its practical operational form. The introduction of the management and control described above has led to relatively good results for the project by operating on the road project with a public-private partnership (PPP) in the startup area of the Chengdu Tianfu International Airport New Town.http://dx.doi.org/10.1155/2022/4669792
spellingShingle Haipeng Wang
Integrated Urban Design Methodology of “Planning-Construction-Management” and Intelligent Management and Control Based on Teaching Reproduction Robot
Journal of Robotics
title Integrated Urban Design Methodology of “Planning-Construction-Management” and Intelligent Management and Control Based on Teaching Reproduction Robot
title_full Integrated Urban Design Methodology of “Planning-Construction-Management” and Intelligent Management and Control Based on Teaching Reproduction Robot
title_fullStr Integrated Urban Design Methodology of “Planning-Construction-Management” and Intelligent Management and Control Based on Teaching Reproduction Robot
title_full_unstemmed Integrated Urban Design Methodology of “Planning-Construction-Management” and Intelligent Management and Control Based on Teaching Reproduction Robot
title_short Integrated Urban Design Methodology of “Planning-Construction-Management” and Intelligent Management and Control Based on Teaching Reproduction Robot
title_sort integrated urban design methodology of planning construction management and intelligent management and control based on teaching reproduction robot
url http://dx.doi.org/10.1155/2022/4669792
work_keys_str_mv AT haipengwang integratedurbandesignmethodologyofplanningconstructionmanagementandintelligentmanagementandcontrolbasedonteachingreproductionrobot