Application of Controlled Blasting in Dahaiting Reservoir Reinforcement Project
Saved in:
| Main Authors: | 姚德贵, 赵明 |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2003-01-01
|
| Series: | Renmin Zhujiang |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47670907&Fpath=home&index=0 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Application of Controlled Blasting Technology in the Modification Project for Dongshen Water Supply
by: 张力文, et al.
Published: (2004-01-01) -
Application of Finite_Difference Equation on Stability Calculation of Reservoir Band of Lechang George
Project
by: 王汇明
Published: (2001-01-01) -
Controlled Blasting Test in Quarrying for Concrete Faced Rockfill Dam of Dahe Reservoir
by: 马忠旭
Published: (2003-01-01) -
Practice of Fire-dragon moxibustion and key points in moxibustion temperature control (火龙灸技术操作和温度控制要点经验总结)
by: YAO Deming (姚德明)
Published: (2023-09-01) -
Blast-Resistant Design of Reinforced Concrete Slabs with Auxetic-Shaped Reinforcement Layout
by: Oğuz Kağan Genç, et al.
Published: (2024-10-01)