Understanding the Disruptiveness of Integrated Project Delivery (IPD) in the AEC Industry
The Architecture, Engineering, and Construction (AEC) industry is plagued by persistent challenges such as low productivity, cost overruns, and frequent project delays. Integrated Project Delivery (IPD) has emerged as a potential solution, offering collaborative approaches to improve project outcome...
Saved in:
| Main Authors: | Puyan A. Zadeh, Juliette Mollard Thibault, Sheryl Staub-French, Devarsh Bhonde |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2025-07-01
|
| Series: | Buildings |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2075-5309/15/13/2338 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Capability Maturity Model for Integrated Project Delivery
by: Ahmad J. Arar, et al.
Published: (2025-05-01) -
Real Estate Owners’ Early Thoughts on Lean IPD Implementation in Spain
by: José Javier Gil Sebastián, et al.
Published: (2025-02-01) -
Systematic Literature Riview: Peranan metode BIM dalam Integrated Project Delivery (IPD) untuk Mengoptimalkan Konstruktabilitas Proyek
by: GUSLIAINI ALIFIA PAMBUDI, et al.
Published: (2025-07-01) -
Methodological aspects of investment and construction projects management based on IPD, BIM, LEAN. Foreign experience
by: V. S. Kustov, et al.
Published: (2024-02-01) -
Optimizing Residential Buildings Desing Using Integrated Project Delivery (IPD) and Building Information Modeling (BIM): A Case Study in Peru
by: Delta Salome Tizon Checca, et al.
Published: (2025-03-01)