Parallel Machine Production and Transportation Operations’ Scheduling with Tight Time Windows

This study addresses a parallel machine production and transportation operations’ scheduling problem with a tight time window associated with the transfer and delivery process. The orders located at the parallel machines need to be delivered to customers by train. Each order must be processed within...

Full description

Saved in:
Bibliographic Details
Main Authors: Yang Jiang, Tong He, Jie Xiong, Xin Wu, Yao Chen
Format: Article
Language:English
Published: Wiley 2020-01-01
Series:Complexity
Online Access:http://dx.doi.org/10.1155/2020/1381340
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This study addresses a parallel machine production and transportation operations’ scheduling problem with a tight time window associated with the transfer and delivery process. The orders located at the parallel machines need to be delivered to customers by train. Each order must be processed within a limited completion time in order for the product to be matched with the optimal trip to its destination within the delivery period. A mathematical analysis method is used to reveal the impact of tight time windows on the scheduling of production and transportation operations. The order transfer redundancy time and order transfer waiting time are employed to reflect the impact scheduling of production on the transfer process. The order delivery redundancy time and order delivery waiting time are used to describe delivery operations. The goal is to maximize the coordination level of order transfer and delivery, which are reflected in the order transfer time and the order delivery time, respectively. Additionally, a simulated annealing algorithm using the column generation technique was developed to solve this problem. The results show that the use of the system coordination model in this method obviously improves the number of successful transfers and deliveries.
ISSN:1076-2787
1099-0526