Modelling and simulation of the block pouring construction system considering spatial–temporal conflict of construction machinery in arch dams
Abstract The spatial–temporal conflicts in the construction process may cause a series of construction quality, safety and schedule problems. The outbreak of mechanical spatial–temporal conflict in the construction process of the arch dam pouring block is random and uncertain. Scientific simulation...
Saved in:
| Main Authors: | Zhipeng Liang, Jiayao Peng, Chunju Zhao, Huawei Zhou, Dongfeng Li, Yihong Zhou, Quan Liu, Xiaodong Li, Cheng Zhang, Fang Wang |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Nature Portfolio
2025-08-01
|
| Series: | Scientific Reports |
| Subjects: | |
| Online Access: | https://doi.org/10.1038/s41598-025-09998-6 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimization of time and temperature of dam construction for thermal analysis of roller compacted concrete dam
by: Ramtin Sobhkhiz Foumani, et al.
Published: (2023-06-01) -
The impact of anthropic activity based on dam construction and land-use-type in plankton on taxonomic and functional groups
by: Qinghua Li, et al.
Published: (2025-04-01) -
Stress control method for concrete pouring construction of continuous CFST tied arch bridge: Calculation method and actual bridge case
by: Zengwu Liu, et al.
Published: (2025-12-01) -
The Optimum design of arch dam shape using Particle Swarm optimization algorithm
by: seyed reza mousvi, et al.
Published: (2025-03-01) -
Detection of Cracks in Arch Dams Using Monitoring Data and Numerical Models
by: André Conde, et al.
Published: (2025-05-01)