Identification of contractors claims in Turnkey projects according to FIDIC by the system dynamics method (Case study on the 7008 housing units building project in Ojeda, Venezuela)

In this study, contractor’s claim and its management in in turnkey contracts according to FIDIC has been discussed through library studies and surveys among experienced specialists in international civil projects and then this discussion has been developed with benefit of modeling the claim using sy...

Full description

Saved in:
Bibliographic Details
Main Authors: Amir Momeni, Elham Rastar, Armin Monirabbasi
Format: Article
Language:fas
Published: Assist. Prof. Dr. Roohollah Taherkhani 2019-02-01
Series:مهندسی و مدیریت ساخت
Subjects:
Online Access:https://www.jecm.ir/article_103639_bdd16ef4b00dcd5ba905f88f582d4c03.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850116631317970944
author Amir Momeni
Elham Rastar
Armin Monirabbasi
author_facet Amir Momeni
Elham Rastar
Armin Monirabbasi
author_sort Amir Momeni
collection DOAJ
description In this study, contractor’s claim and its management in in turnkey contracts according to FIDIC has been discussed through library studies and surveys among experienced specialists in international civil projects and then this discussion has been developed with benefit of modeling the claim using system dynamics and its evaluattion on a case study as well as relying on opinions of experts.As a result of modeling the claims of contractors in in turnkey contracts according to FIDIC, the most important variables and parameters affecting or affected the claims, their intensity and type of relationship with each other was determined in this contracts.The results show that modeling by system dynamics method is very useful for qualitative and quantitative analysis of the contractor’s claims.can be admitted the most important factors affect the claims of contractors in turnkey contracts according to FIDIC that 75% of them are financial claims are the delays of employer payments with a share of about 60% , project changes with a share of nearly 20% and both are under the influence of strategies and management procedures, Also their intensity will be increased in force majeure situations and unexpected events, Moreover, The lack of project management system and risk allocation and not having got of ownershipflotationon the project scheduledisturbance in process of managing the claims of contractors in Turnkey contracts according to FIDIC.
format Article
id doaj-art-89e0ff4bf60d4a74a5040de6a01a7e0c
institution OA Journals
issn 2538-1903
2538-2578
language fas
publishDate 2019-02-01
publisher Assist. Prof. Dr. Roohollah Taherkhani
record_format Article
series مهندسی و مدیریت ساخت
spelling doaj-art-89e0ff4bf60d4a74a5040de6a01a7e0c2025-08-20T02:36:16ZfasAssist. Prof. Dr. Roohollah Taherkhaniمهندسی و مدیریت ساخت2538-19032538-25782019-02-0134515103639Identification of contractors claims in Turnkey projects according to FIDIC by the system dynamics method (Case study on the 7008 housing units building project in Ojeda, Venezuela)Amir Momeni0Elham Rastar1Armin Monirabbasi2Master of Project & Construction Management, Islamic Azad University, Ardestan, IranMaster of Engineering and Construction Management, Payame Noor University, Karaj, IranFaculty member of Civil Department in Payam-e-Noor University, Tehran, IranIn this study, contractor’s claim and its management in in turnkey contracts according to FIDIC has been discussed through library studies and surveys among experienced specialists in international civil projects and then this discussion has been developed with benefit of modeling the claim using system dynamics and its evaluattion on a case study as well as relying on opinions of experts.As a result of modeling the claims of contractors in in turnkey contracts according to FIDIC, the most important variables and parameters affecting or affected the claims, their intensity and type of relationship with each other was determined in this contracts.The results show that modeling by system dynamics method is very useful for qualitative and quantitative analysis of the contractor’s claims.can be admitted the most important factors affect the claims of contractors in turnkey contracts according to FIDIC that 75% of them are financial claims are the delays of employer payments with a share of about 60% , project changes with a share of nearly 20% and both are under the influence of strategies and management procedures, Also their intensity will be increased in force majeure situations and unexpected events, Moreover, The lack of project management system and risk allocation and not having got of ownershipflotationon the project scheduledisturbance in process of managing the claims of contractors in Turnkey contracts according to FIDIC.https://www.jecm.ir/article_103639_bdd16ef4b00dcd5ba905f88f582d4c03.pdfclaimfidicturnkeypmboksystem dynamic
spellingShingle Amir Momeni
Elham Rastar
Armin Monirabbasi
Identification of contractors claims in Turnkey projects according to FIDIC by the system dynamics method (Case study on the 7008 housing units building project in Ojeda, Venezuela)
مهندسی و مدیریت ساخت
claim
fidic
turnkey
pmbok
system dynamic
title Identification of contractors claims in Turnkey projects according to FIDIC by the system dynamics method (Case study on the 7008 housing units building project in Ojeda, Venezuela)
title_full Identification of contractors claims in Turnkey projects according to FIDIC by the system dynamics method (Case study on the 7008 housing units building project in Ojeda, Venezuela)
title_fullStr Identification of contractors claims in Turnkey projects according to FIDIC by the system dynamics method (Case study on the 7008 housing units building project in Ojeda, Venezuela)
title_full_unstemmed Identification of contractors claims in Turnkey projects according to FIDIC by the system dynamics method (Case study on the 7008 housing units building project in Ojeda, Venezuela)
title_short Identification of contractors claims in Turnkey projects according to FIDIC by the system dynamics method (Case study on the 7008 housing units building project in Ojeda, Venezuela)
title_sort identification of contractors claims in turnkey projects according to fidic by the system dynamics method case study on the 7008 housing units building project in ojeda venezuela
topic claim
fidic
turnkey
pmbok
system dynamic
url https://www.jecm.ir/article_103639_bdd16ef4b00dcd5ba905f88f582d4c03.pdf
work_keys_str_mv AT amirmomeni identificationofcontractorsclaimsinturnkeyprojectsaccordingtofidicbythesystemdynamicsmethodcasestudyonthe7008housingunitsbuildingprojectinojedavenezuela
AT elhamrastar identificationofcontractorsclaimsinturnkeyprojectsaccordingtofidicbythesystemdynamicsmethodcasestudyonthe7008housingunitsbuildingprojectinojedavenezuela
AT arminmonirabbasi identificationofcontractorsclaimsinturnkeyprojectsaccordingtofidicbythesystemdynamicsmethodcasestudyonthe7008housingunitsbuildingprojectinojedavenezuela